113
–.
Programme for hot-water service
with storage capacity boiler unit
Select.the.days.that.correspond.with.the.heating.phase..
1=.Monday,.....7.=.Sunday/8.=.hot-water.service.programme
Start.of.phase.1:.heating.with.fixed.modality
End.phase.1:.heating.with.reduced.modality
Start.phase.2:.heating.with.fixed.modality
End.phase.2:.heating.with.reduced.modality
Start.phase.3:.heating.with.fixed.modality
End.phase.3:.heating.with.reduced.modality
Copying.of.the.daily.programme
By.pressing.this.key.it.is.possible.to.repeat.the.current.heating.pro-
gramme.for.the.
next day
.
By.pressing.this.key.it.is.possible.to.repeat.the.current.heating.pro-
gramme.for.the.
previous day
.
As.a.confirmation.the.following.day.is.displayed.
4
5
6
7
8
9
10
1 1
With.the.Logic.Remote.Control.it.is.possible.to.manage.the.temperature.of.boiler.unit.on.
two.levels.(a.comfort.level.and.one.at.reduced.temperature).in.accordance.with.the.pro-
gramme.chosen.with.parameter.62.(load.hot-water.service)..To.have.access.to.the.para-
meter.press.the.
and
.keys.for.at.least.5.seconds.and.then.go.along.the.entered.
lines.with.the.
key.until.parameter.62.is.reached..At.this.point.four.different.program-
mes.may.be.selected.with.
o
keys,.with.the.following.characteristics:
0
.=.24.hours/.day.-.Hot.water.always.available.at.the.temperature.set.in.parameter.3.
1
.=. standard. -. Hot. water. according. to. the. daily. heating. programme.. In. the. comfort.
periods.of.the.heating.the.temperature.of.the.boiler.unit.is.regulated.at.the.value.
set.via.parameter.61.
2
.=.sservice.suspended.
3
.=.second.daily.programme.(8).-.Everyday.of.the.week..the.temperature.of.the.hot-
water.service.is.set.according.to.programme.B..In.this.case.the.programming.is.one.
for.all.the.days.of.the.week.and.three.periods.of.time.are.available..In.the.periods.of.
time.set,.the.temperature.of.the.boiler.unit.is.controlled.via.the.temperature.setting.
of.parameter.61.
Start.phase.1:.preparation.of.the.boiler.unit.to.the.comfort.temperature
End.phase.1:.Temperature.of.boiler.unit.maintained.at.the.reduced.value
Start.phase.2:.Preparation.of.boiler.unit.to.the.comfort.temperature
End.phase.2:..Temperature.of.boiler.unit.maintained.at.the.reduced.value.
Start.phase.3:.preparation.of.boiler.unit.to.the.comfort.temperature
End.phase.3:.Temperature.of.boiler.unit.maintained.at.the.reduced.value
5
6
7
8
9
10
–.
Heating/hot-water
service programme
With.the.heating.programme.it.is.possible.to.set.the.switching.times.of.the.temperature.
for.a.period.of.a.week..The.weekly.programme.consists.of.7.daily.programmes..One.daily.
programme.allows.3.phases.of.heating..Each.phase.is.defined.by.a.starting.time.and.a.
finishing.time..The.n..8.daily.programme.is.for.the.hot-water.service..If.a.phase.is.not.
required,.the.same.starting.and.finishing.time.may.be.entered.
Содержание LOGO 22 OF TS
Страница 1: ...IT ES PT GB DE RO...
Страница 2: ......
Страница 4: ......
Страница 33: ...29...
Страница 34: ...30...
Страница 35: ......
Страница 64: ...31...
Страница 65: ......
Страница 93: ......
Страница 123: ......
Страница 151: ......
Страница 180: ......
Страница 181: ......
Страница 182: ......
Страница 183: ......