47
– loosen the clips (6) and extract the air inlet pipe (7)
– loosen both the ring nuts (8)
– extract the connectors (9) from the fan and disconnect the
electrode cable (10)
9
10
8
6
7
8
6
Fig. 59
– Unscrew the four nuts (11) securing the combustion cham-
ber door (12)
– pull the fan-sleeve-door assembly (13) forwards and re-
move it.
11
11
13
12
Fig. 60
m
CAUTION
Work carefully when removing the assembly (13) to pre-
vent any damage occurring to the internal insulation of
the combustion chamber and the door seal.
8.3.2 Cleaning the burner and the combustion
chamber
The combustion chamber and the burner do not require any
particular maintenance. Simply brush them with a soft brush.
8.3.3 Checking the ignition/detection electrode
Check the state of the ignition/detection electrode and replace
if necessary. Check the measurements as per the drawing
whether the ignition/detection electrode is replaced or not.
m
CAUTION
(*)
The positions must be checked with the electrode
mounted on the door (12) of the combustion chamber.
±1
(*) 7,5
(*) 4,6
±0,5
Fig. 61
8.3.4 Final operations
After having cleaned the combustion chamber and the burner:
– remove any carbon residue
– check that the seal and the insulation of the door (12) to the
combustion chamber are undamaged. Replace if necessary
– refit the assembly by carrying out the same operations for
removal but in the reverse order and tighten the screws (11)
of the door to the combustion chamber
– reconnect the connections to the fan and the electrode.
8.4
Checks
8.4.1 Checking the flue
Check that the flue is undamaged and complete.
8.4.2 Checking the expansion vessel pressure
It is recommended that the expansion vessel on the water side
is drained and that the prefilling pressure is not less than
1
bar
. If this is not the case, pressurize it to the correct value
(see section "Expansion vessel").
8.4.3 System Inhibiter concentration
Check and if required correct the inhibiter concentration.
Once the checks described above have been completed:
– refill the boiler as described in section "SYSTEM Filling"
– check that the siphon has been filled correctly
– Start the boiler, activate the "Chimney sweep function" and
carry out combustion analysis as detailed in Appendix 2
– refit the front panel securing it with the two screws which
were removed previously.
Содержание 8116910
Страница 4: ...4 ...
Страница 14: ...14 ...
Страница 54: ...54 9 EXPLODED VIEWS Frame ...
Страница 55: ...55 Hydraulic assembly ...
Страница 56: ...56 Exchanger Combustion ...
Страница 57: ...57 Control panel ...
Страница 58: ...58 Gas valve Air gas duct Fan ...
Страница 79: ...79 ...