Server Installation
This chapter provides a quick setup checklist to get the SGI UV 30 server operational.
Unpack the System
Inspect the shipping container used for the server and note if it was damaged in any way. If the
server shows damage, file a damage claim with the carrier who delivered it.
Decide on a suitable location for the rack that supports the weight, power requirements, and
environmental requirements of the server. It should be situated in a clean, dust-free environment
that is well ventilated. Avoid areas where heat, electrical noise, and electromagnetic fields are
generated. Place the server rack near a grounded power outlet. Refer to
Prepare for Setup
The shipping container should include two sets of rail assemblies, two rail mounting brackets and
the mounting screws that you will use to install the system into a rack.
Read this section in its entirety before you begin the installation procedure.
Содержание UV 30
Страница 1: ...SGI UV 30 System User Guide 007 6419 002 ...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 21: ...Serverboard Features 007 6419 002 5 Figure 1 4 Serverboard Block Diagram ...
Страница 33: ...Install the System into a Rack 007 6419 002 17 Figure 3 2 Installing the Inner Rails ...
Страница 37: ...Check the Serverboard Setup 007 6419 002 21 Figure 3 4 Accessing the Inside of the Chassis ...
Страница 49: ...Replacing a Power Supply 007 6419 002 33 Figure 5 3 Replacing a Power Supply ...
Страница 51: ...Replacing Disk Drives 007 6419 002 35 Figure 5 4 Removing HDD Carrier from Chassis ...
Страница 52: ...36 007 6419 002 5 Chassis Maintenance Figure 5 5 Removing Dummy Drive from Carrier ...
Страница 55: ...Replacing System Fans 007 6419 002 39 Figure 5 7 System Fans ...
Страница 56: ......
Страница 64: ......
Страница 66: ......