A: InfiniBand Fabric Details
IRU
IRU
InfiniBand
connections
between
IRUs
Switch b
lade
Switch b
lade
16 compute
nodes
Switch b
lade
Switch b
lade
16 compute
nodes
Leader node
HCA connection
to switch blade
Leader node
HCA
Leader node
HCA connection
to switch blade
ib0
ib1
Figure A-1
Two InfiniBand Fabrics in a System with Two IRUs
With Scali Manage, the routing engine is chosen automatically based on the number
of racks in the system. For up to two racks, the "
Min Hop
" algorithm is used. For
more than two racks, the
‘‘lash’’
algorithm is used which enables LAyered
SHortest Path Routing (LASH).
When the
lash
routing algorithm is used, the subnet managers need to be restarted
after the entire Altix ICE system is up. To restart the subnet managers, perform the
following command:
scalimanage-cli restartaltixiceopensm
As stated above, there are two
opensm
daemons, one for each fabric,
opensmd-ib0
and
opensmd-ib1
, respectively. They are controlled by the
init.d
scripts. Each
50
007–5450–001
Содержание Altix ICE 8000 Series
Страница 1: ...Scali ManageTM On SGI Altix ICE System Quick Reference Guide 007 5450 001 ...
Страница 3: ...Record of Revision Version Description 001 April 2008 Original publication 007 5450 001 iii ...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 11: ...Examples Example A 1 opensm ib0 conf and opensm ib conf Configuration Files 45 007 5450 001 xi ...
Страница 12: ......
Страница 13: ...Procedures Procedure A 1 Configuring and Initializing the InfiniBand Fabric Manually 51 007 5450 001 xiii ...
Страница 14: ......