11
2. Installation
Unpacking
Check the packaging for any signs of damage. Carefully remove the machine and retain the packaging
until the installation is complete.
Positioning of the machine
Place the machine on a firm, dry and level surface. Where possible, do not allow dust or other impurities
to enter the machines cooling air flow. Preferably site the machine above floor level; for example on a
suitable carriage unit.
Notes for positioning the machine
• The surface inclination should not exceed 15 degrees.
• Ensure the free circulation of the cooling air. There must be at least 20cm of free space in front
of and behind the machine for cooling air to circulate.
• Protect the machine against damp and direct sunlight.
NOTE!
The machine should not be operated in heavy rain as the protection class of the machine, IP23S,
allows for limited outside use.
NOTE!
Never aim metallic grinding spray/
sparks towards the equipment.
Input connection
Before connecting the machine you should
ensure that the correct supply is available.
Details of the machine requirements can
be found on the data plate of the machine
or in the technical parameters shown in
the manual. The equipment should be
connected by a suitably qualified competent
person. Always ensure the equipment has
a proper grounding. Never connect the
machine to the mains supply with the
panels removed.
Working connections
Connect the cutting torch, earth cable and
regulator, according to the connection
diagram. The gas supply can be either air
or nitrogen. A high pressure regulator must
be used on either type of gas and must be
capable of delivering 155 l/min at a pressure
of 72 psi ( 5.0 bar) to the machine. Ensure the
air supply is dry and oil free.
www.sifweld.com
Front & Rear Panel
1. Alarm LED
2. Power LED
3. Over Temperature LED
4. MCP Knob
5. Cutting Torch Euro Connector
6. Earth Return
7. LCD Display
8. Input Power Switch
9. Air Inlet
10. Power Input Cable
TXP1P40