6 – 6
6.3
Check list for commissioning
DANGER
Hazardous voltage.
Will cause death, serious personal injury, or equipment damage.
Turn off and lock out all power supplying this device before working on this device.
Action required
q
Verify the circuit breaker is OPEN
Verify the rating plug is installed
Verify the TRIP indicator is reset
Set the
trip unit
to appropriate values
Apply secondary and control voltages
Close the cubicle door
Rack circuit breaker into connected position
Push in the racking handle
Charge closing spring
Ensure the following conditions exist
Undervoltage release
energized
Locking devices
not activated
Indicators
Содержание UL 1066
Страница 43: ...6 12 7 Reset reclosing lockout 8 Charge closing spring 9 Switch ON Frame size II Frame size III 9X ...
Страница 56: ...7 5 7 2 Frame size II fused ...
Страница 58: ...7 7 ...
Страница 63: ...7 12 8 27 210 0 8 27 210 0 8 27 210 0 3 75 95 2 ...
Страница 64: ...7 13 ...
Страница 65: ...7 14 7 7 Frame size III fuse carriage ...
Страница 66: ...7 15 ...
Страница 69: ...7 18 7 9 External sensor for neutral conductor WLNCT2 ...
Страница 70: ...7 19 WLNCT3 ...
Страница 85: ...9 5 I tripping Ground fault tripping ...
Страница 231: ...15 12 Pre assembling the locking module Installing 0767 1 2 3 4 6 5 ...
Страница 232: ...15 13 1 Socket head cap screw M5 with washer and nut 7 8 Size 4 5 Nm 45 lb in ...
Страница 271: ...19 10 Function check Then Fit back front panel and side cover on the right if it was removed page 23 4 10 ...
Страница 280: ...21 2 Installing the door sealing frame Not for use with fuse carriages Catalog No Door sealing frame WLDSF 1 2 3 NOTICE ...
Страница 289: ...23 7 23 3 3 Installing arc chutes 1 2 6 5 PH 2 0043 02 3 4 5 6 For frame size III 3 PH 2 ...
Страница 298: ...23 16 6 7 8 9 5 2 1 Size 5 mm ...
Страница 333: ......