14 – 4
14.3
Operations counter
The operations counter is incremented when the circuit breaker completes the charging cycle (manual or electrically operated).
The mechanical operations counter can be installed only if the circuit breaker is equipped with a motor-operated mechanism.
Knocking out the fields on the front panel
Catalog No.
Catalog No.
Mechanical operations counter
WLNUMCNT
1
2
PZ 1
Front panel
knock out
Use a suitable base.
deburr
Содержание UL 1066
Страница 43: ...6 12 7 Reset reclosing lockout 8 Charge closing spring 9 Switch ON Frame size II Frame size III 9X ...
Страница 56: ...7 5 7 2 Frame size II fused ...
Страница 58: ...7 7 ...
Страница 63: ...7 12 8 27 210 0 8 27 210 0 8 27 210 0 3 75 95 2 ...
Страница 64: ...7 13 ...
Страница 65: ...7 14 7 7 Frame size III fuse carriage ...
Страница 66: ...7 15 ...
Страница 69: ...7 18 7 9 External sensor for neutral conductor WLNCT2 ...
Страница 70: ...7 19 WLNCT3 ...
Страница 85: ...9 5 I tripping Ground fault tripping ...
Страница 231: ...15 12 Pre assembling the locking module Installing 0767 1 2 3 4 6 5 ...
Страница 232: ...15 13 1 Socket head cap screw M5 with washer and nut 7 8 Size 4 5 Nm 45 lb in ...
Страница 271: ...19 10 Function check Then Fit back front panel and side cover on the right if it was removed page 23 4 10 ...
Страница 280: ...21 2 Installing the door sealing frame Not for use with fuse carriages Catalog No Door sealing frame WLDSF 1 2 3 NOTICE ...
Страница 289: ...23 7 23 3 3 Installing arc chutes 1 2 6 5 PH 2 0043 02 3 4 5 6 For frame size III 3 PH 2 ...
Страница 298: ...23 16 6 7 8 9 5 2 1 Size 5 mm ...
Страница 333: ......