background image

    

Danger

  

Peligro

     

Danger

Hazardous Voltage.
Will cause death or serious injury.

Tensión peligrosa.
Puede causar la muerte o lesiones graves.

Tension dangereuse.
Danger de mort ou risque de blessures graves.

Turn off and lock out all power supplying this 
device before working on this device.
Replace all covers before power supplying 
this device is turned on.

Desenergice totalmente antes de instalar o 
darle servicio. 
Reemplace todas las barreras y cubiertas antes 
de energizar el interruptor.

Couper l’alimentation de l’appareil et barrer 
avant de travailler.
Remplacez touts les couverts avant que
l’approvisionnement de pouvoir soit alimenté.

2

TPS4-01 Surge Protection Device | 

Installation Guide / User Manual

 • 

This manual shall be read in entirety prior to installing

 

•  Only qualified licensed electricians should install or service SPDs

 

•  Hazardous voltages exist within SPDs

 

•  SPDs should never be installed or serviced when energized

 

•  Use appropriate safety precautions including Personal Protection Equipment

 

•  Failure to follow these instructions can result in equipment damage, serious injury and/or death.

Bonding and Grounding Hazard

Verify that the neutral conductor in the service entrance equipment is bonded to ground in accordance with the 
National Electrical Code (NEC®) and all applicable codes.

Verify that the neutral terminal (XO) on the secondary side of distribution transformers are grounded to the system 
ground in accordance with the NEC® and all applicable codes.

During installation into an electrical system the SPD must not be energized until the electrical system is completely 
installed, inspected and tested. All conductors must be connected and functional including the neutral (if required). 
The voltage rating of the SPD and system must be verified before energizing the SPD.

Failure to follow these guidelines can lead to abnormally high voltages at the SPD. This may cause the SPD to fail.  
The warranty is voided if the SPD is incorrectly installed and/or if the neutral conductor in the service entrance 
equipment or downstream of separately derived systems is not bonded to ground in accordance with the NEC®.

Do Not Hi-Pot Test SPDs 

The TPS4 unit needs to be fully disconnected during Hi-Pot testing. Failure to disconnect SPD and associated 
components during elevated voltage testing will damage the SPD and will void the warranty.

Siemens TPS4 SPDs have the following Type designations:

Table 1: Type Designations

Siemens TPS4 Series

Type Rating

TPS4 01 & L1

Type 1 & 2 Component Assembly

For further information, please review latest editions of 
NEC® Art. 285, UL 1449, contact your local Siemens sales 
office or contact Siemens TPS Tech Support at 800-333-7421.

Equipment Performance

As SPDs sense overvoltage, they create a momentary  
internal short circuit, thereby redirecting harmful surge 
energy to earth ground. SPDs are capable of repeating this 
function repeatedly. For optimum protection, staged surge 
suppression should be implemented at the service entrance 
and all other distribution or panelboard locations feeding 
sensitive equipment.

Voltage Rating

Prior to installing the TPS4 SPD, verify that the unit has  
the correct voltage rating for the equipment installed  
by checking the nameplates of both the equipment  
and TPS4 module. The service type should match the 
intended power source. See Table 2 on the following  
pages for voltage applications.

Содержание TPS4-01

Страница 1: ...usa siemens com spd Installation Guide User Manual TPS4 01 and L1 for P1 P2 P3 Panels Surge Protection Devices ...

Страница 2: ...letely installed inspected and tested All conductors must be connected and functional including the neutral if required The voltage rating of the SPD and system must be verified before energizing the SPD Failure to follow these guidelines can lead to abnormally high voltages at the SPD This may cause the SPD to fail The warranty is voided if the SPD is incorrectly installed and or if the neutral c...

Страница 3: ...e to the equipment but does not create a potential for personal injury These instructions do not purport to cover all details or variations in equipment nor to provide for every possible contingency to be met in connection with installation operation or maintenance Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser s purpo...

Страница 4: ...oo Example TPS4C0120X000 SPD for a 208 120V panelboard with a surge current capacity of 200kA per phase and a surge counter option When an option is not selected include a zero 0 in the field Example TPS4CL120X000 SPD for a 208 120V panelboard with a surge current capacity of 200kA per phase and a surge counter option When an option is not selected include a zero 0 in the field TPS4 01 SPD for RP1...

Страница 5: ... normal operation and will only conduct current for a very brief duration upon encountering a transient surge The TPS4 unit contains overcurrent and thermal protection to protect against abnormal overvoltage conditions System Grounding An equipment grounding conductor must be used on all electrical circuits connected to the SPD For the best performance use a single point ground system where the se...

Страница 6: ... captive washer 2 or 3 65 in lb 7 Neutral Lug Wire Connection N A 120 in lb 8 36 8 AWG White Neutral Conductor 1 only 2 tabs for single phase modules Figure 1 Revised P1 Panel 1 2 3 4 5 6 7 8 Figure 2 Revised P1 Panel Phase Tab Detail Step 1 Lock off all power supplying this equipment before working on it Step 2 Attach TPS4 Mounting Plates Item 2 2 Places to TPS4 using 10 32 SEM screws with captiv...

Страница 7: ...riented from left to right A B C A The SPD Phase Tab for Phase A must be located above the panelboard bus for Phase A B The SPD Phase Tab for Phase B must be located above the panelboard bus for Phase B C The SPD Phase Tab for Phase C must be located above the panelboard bus for Phase C Care must be taken when connecting to branch breaker to insure that A B C phase connection sequence is maintaine...

Страница 8: ... the panel base rail so that the TPS4 Line Bus Connectors line up with panel bus mounting toles Slide the unit toward the interior until the four mounting holes line up with the four holes in the base rail Step 7 P2 Panel Fasten unit to the main bus using the P2 Panel Carriage Bolt and Nut with captive washer Item 7 provided w P2 Panel Do not Torque at this time Attach the Mounting Plates item 2 t...

Страница 9: ...lay using a T10 Tamper Resistant Torx bit Retain screws Rotate display pocket 180 degrees Carefully fold ribbon cable below pocket and route to minimize sharp bends and double over cable directly beneath the display pocket Reinstall retained 6 32 tamper resistant screws and torque screws to value listed Table 6 Content for display rotation 1 2 Item Description Qty Torque 1 TPS4 Display re use 1 2 ...

Страница 10: ... When all LED s are green the suppressor is on line and functioning properly If a fault condition occurs the audible alarm will sound the Red Service LED will illuminate and the LED representing the affected phase will extinguish indicating that the unit needs service The audible alarm can be silenced by pressing ALARM SILENCE on the touchpad The audible alarm and Dry Contact can be tested by depr...

Страница 11: ... will be displayed again When the SPD experiences an event the screen saver will be dismissed and will not be displayed again until the event is acknowledged by an operator Main Screen The Main Screen is the starting point for navigating through the SPDs menus The Main Screen will show the logged data for the most recent event as well as the current time and date Pressing the UP or DOWN buttons wi...

Страница 12: ...m to the SPD memory You will automatically be brought back to the Setup Menu Adjust Time Screen The Adjust Time Screen will allow you to set the time of the SPD Use the UP DOWN buttons to adjust the value in the selected field until you have the correct value Pressing the CENTER button will advance the cursor to the next time field Once the Seconds have been set pressing the CENTER button will fin...

Страница 13: ...n Surge Event Screen When the SPD detects a surge event this animation will be shown It will remain on screen until acknowledged by an operator Any subsequent events that occur while the Surge event animation is on screen will be registered and queued for acknowledgment Along with displaying the Surge animation the Audio alarm will sound Pressing the CENTER button will acknowledge the event and cl...

Страница 14: ...round Any subsequent events that occur while the NGF event animation is on screen will be registered and queued for acknowledgment Along with displaying the NGF animation the Audio alarm will sound Pressing the CENTER button will acknowledge the event and clear the alarm state The Main Screen will be showing the details for the NGF The SPD may be exposed to a NGF for several minutes The NGF animat...

Страница 15: ... Eventually that resistor will overheat and cause thermally sensitive shrink wrap to shrink around the resistor This does not occur on transient or instantaneous N G overvoltages When the SPD is deenergized the shrink wrap covered resistor can be accessed by qualified personnel under the display plate cover Module Replacement Service The module is field replaceable Service should only be performed...

Страница 16: ...for any specific application and does not constitute a performance guarantee for any projects Actual results are dependent on variable conditions Accordingly Siemens does not make representations warranties or assurances as to the accuracy currency or completeness of the content contained herein If requested we will provide specific technical data or specifications with respect to any customer s p...

Отзывы: