12. Memory Erase Jumper 

Each controller features a memory erase jumper that can be 
used to erase the Neuron chip’s memory. If an incorrect APB 
file is loaded into the controller, the Neuron chip's memory will 
be corrupted and no communication with the controller will be 
possible. The memory erase jumper can be used to correct this 
problem by resetting the Neuron chip’s memory; the chip will 
then be in an application-less state. The memory erase jumper 
is labeled J5. 
To erase the Neuron chip's memory using the memory erase 
jumper, do the following: 
1. Disconnect the power to the controller. 
2. Place a jumper on the pins labeled J5 on the controller. 

 

Figure 20: Memory Erase Jumper Location (J5). 

 

3. Reconnect power to the controller.  
4. The orange-colored service LED will blink rapidly indicating 

that it is erasing the Neuron chip's memory. When the 
service LED stops blinking and remains solid, the erase 
procedure is complete. The erase procedure typically takes 
between 2 and 10 seconds.  

5. Disconnect the power to the controller and remove the 

jumper. 

6. Reconnect the power. The service LED will blink twice and 

become solid indicating that the controller is application-
less. 

The proper APB (using the 

Commission

 or 

Load

 option in 

LNS, e.g. SLX Series LMT) can now be loaded into the 
controller.  

 

13. Maintenance 

 

Due to 

HIGH VOLTAGE

, direct contact will 

cause electrical shock or burn. Turn off power 
before any kind of servicing. 

 
The PFCU and PTU controllers require minimal maintenance, 
but it is important to take note of the following: 

If it is necessary to clean the outside of the front plate 
and/or the inside of the back plate, use a 

dry

 cloth. 

Verify the tension of all wires and cables whenever the 
controller is serviced. 

14. Disposal 

The Waste Electrical and Electronic Equipment (WEEE) 
Directive sets out regulations for the recycling and disposal of 
products. The WEEE2002/96/EG Directive applies to 
standalone products, i.e. products that can function entirely on 

their own and are not a part of another system or piece 
of equipment.  
For this reason, SLX Series products are exempt from 
the WEEE Directive. Nevertheless, SLX Series 

products are marked with the WEEE symbol, indicating that 
disposal of the devices shall not be done together with 
municipal waste. 
Products must be disposed of at the end of their useful life 
according to local regulations and the WEEE Directive. 

 

Содержание SLX-ASC-PFCU

Страница 1: ...illers and boilers Moreover they are suitable for any lighting control and power measurement applications All of the controllers are based on the LONWORKS technology for peer to peer communication between controllers and are LONMARK certified Unless otherwise indicated the term PFCU is used in this document to represent both the SLX ASC PFCU and SLX ASC PFCU A models Likewise PTU represents both t...

Страница 2: ...electrical shock or burn Warning Symbol Significant information required Refer to Hardware Installation Guide Double Insulation Symbol These controllers are built with double insulation 4 General Wiring Recommendations Due to HIGH VOLTAGE direct contact will cause electrical shock or burn Turn off power before any kind of servicing It is recommended to use a 2 line main power disconnect to be loca...

Страница 3: ...h less than 75 23m either a shielded or unshielded 18AWG wire may be used For a wire length between 75 and 200 23 to 61m a shielded 18AWG wire is recommended The wire should be shielded on the controller side and the shield length should be kept as short as possible Wiring Digital Inputs This input configuration is used to monitor digital dry contacts as well as pulsed contacts PTU controllers onl...

Страница 4: ... to the installation guide of the equipment manufacturer Wiring Relay Contact Outputs Three 3 relay contact outputs DO1 DO3 can switch 3A inductive resistive for fan speed control up to 277VAC and one 1 relay contact output DO4 can switch 3A inductive and 10A resistive for heater control up to 277VAC Relay contact output cables must remain between 18 and 14AWG Select the proper gauge according to ...

Страница 5: ... 10VDC Universal Output Analog Actuator 11 Communications Wiring The recommended cable type for LON communications is 22AWG 0 65 mm twisted pair unshielded The LON communication wire is polarity insensitive and can be laid out in a bus star loop or free topology For loop topology polarity is important and special care must be taken when connecting the LON network to avoid a short circuit It is rec...

Страница 6: ... jumper 6 Reconnect the power The service LED will blink twice and become solid indicating that the controller is application less The proper APB using the Commission or Load option in LNS e g SLX Series LMT can now be loaded into the controller 13 Maintenance Due to HIGH VOLTAGE direct contact will cause electrical shock or burn Turn off power before any kind of servicing The PFCU and PTU control...

Страница 7: ...Page 7 of 8 15 Typical Fan Coil Application Wiring Diagram 4A Fast acting high breaking 5 x 20mm Fuse PART 216 004XP Littelfuse Fuse holder PART 3004100 Phoenix Contact 15A Fast acting high breaking 6 x 32mm Fuse PART 314015P Littelfuse Fuse holder PART 3004171 Phoenix Contact ...

Страница 8: ...etwork termination Check the termination s Incorrect or broken termination s will make the communication integrity dependent upon a controller s position on the network Extra capacitance Make sure that no extra capacitance is being connected to the network other than the standard FTT circuit and a maximum of a 3 meter stub in bus topology Number of controllers on network segment exceeded The numbe...

Отзывы: