2.  General Installation Requirements 

For proper installation and subsequent operation of each 
controller, pay special attention to the following 
recommendations: 

It is recommended that the controller(s) be kept at room 
temperature for at least 24 hours before installation to 
allow any condensation that may have accumulated, due 
to low temperature during shipping or storage, to 
evaporate. 

Upon unpacking the product, inspect the contents of the 
carton for shipping damages. 

Do not install damaged 

controllers.

 

Allow for proper clearance of controller enclosure, wiring 
terminals and service pin for easy access, hardware 
configuration and maintenance. Remember to record the 
Neuron

®

 ID located on both sides of the controller (in text 

and barcode format) for later commissioning.  

The controller is designed to operate under the following 
environmental conditions:  

ƒ

 

Ambient temperature from 32°F to 122°F (0°C to 50°C) 

ƒ

 

Relative humidity from 0% to 90%, non-condensing. 

Ensure proper ventilation for the controller and avoid 
areas where corroding, deteriorating or explosive vapors, 
fumes or gases may be present. The controller must be 
oriented with the ventilation slots and power supply/output 
terminal block connector towards the top, for safety and to 
permit proper heat dissipation. 

The plastic enclosure has a back plate that is separable 
from the front plate, allowing the back plate (with the 
connectors) to be shipped directly to the installation site 
while all the engineering is done in the office. 

If the controller is used and/or installed in a manner not 
specified, the functionality and the protection provided by 
the controller may be impaired. 

 

Any type of modification to any SLX Series product 
will void the product’s warranty. 

 

 

 

Take special care to keep the front and back plate 
aligned when separating and joining them. 

 

 

 

Take reasonable precautions to prevent 
electrostatic discharges to the controller when 
installing, servicing or operating the controller. 
Discharge accumulated static electricity by 
touching your hand to a securely grounded object 
before working with this controller. 

 

3.  Controller Markings (Symbols) 

Certain markings (symbols) can be found on the back plate of 
the controller and are defined as: 

 

HIGH VOLTAGE Symbol:

 Direct contact will cause 

electrical shock or burn. 

 

Warning Symbol:

 Significant information required. 

Refer to Hardware Installation Guide. 

 

Double Insulation Symbol

: These controllers are 

built with double insulation. 

 

4.  General Wiring Recommendations 

 

Due to 

HIGH VOLTAGE

, direct contact will 

cause electrical shock or burn. Turn off power 
before any kind of servicing. 
 
It is recommended to use a 2-line main power 
disconnect to be located near the controller (the 
minimum power requirements: 300VAC, 20A).  

 

 

Minimum cable temperature rating of all cables 
must be 80°C. 

 

All wiring must comply with electrical wiring diagrams as 
well as national and local electrical codes.  

To connect the wiring to the controller, use the terminal 
connectors. It is recommended to remove the front plate 
from the back plate to facilitate the wiring process; 
however, it is possible to do all wiring with the front and 
back plates together. Use a small flat screwdriver to 
tighten the terminal connector screws after the wires are 
inserted. 

Power type cables (i.e. for power, 2- and 3-wire voltage 
and current inputs and outputs, as well as relay and triac 
outputs) should be kept apart from other types of wiring for 
safety and to avoid any ambient noise transmission to 
other wires. 

The board connectors accept wires or flat cables ranging 
from 22 to 14AWG (0.644 to 1.630mm diameter) per pole. 
However, power cables must remain between 18 and 
14AWG (1.024 to 1.630mm diameter). 

Do not connect the universal inputs, analog outputs or 
common terminals to earth or chassis ground (unless 
stated otherwise). 

Keep all wires away from high speed data transmission 
cables (ie. Ethernet, etc.). 

Keep input and output wiring in conduits or trays, or close 
to the building frame if possible. 

 

5. Mounting 

Instructions 

Each controller can be mounted on a DIN rail to speed up the 
installation process. The controllers are also equipped with two 
mounting holes of 0.25” (6.35mm) by 0.165” (4.191mm). They 
can be mounted in a panel or on a wall by using appropriate 
screw types (use sheet metal, thread forming or self-tapping 
screws accordingly). 

 

Do not mount the controller on a flat surface where 
the front plate would be facing up. It must be 
mounted on a vertical surface such as a wall. 

 

DIN Rail-Mounted Installation 

1. Make sure that the DIN rail is properly mounted on the wall.  
2. Simply clip controller onto the DIN rail. 

 
Wall-Mounted Installation 

1. Open the controller by separating the front and back plate 

using the side clips.  

2. From within the back plate use the mounting holes to mark 

the location of any holes that need to be drilled.  

Содержание SLX-ASC-PFCU

Страница 1: ...illers and boilers Moreover they are suitable for any lighting control and power measurement applications All of the controllers are based on the LONWORKS technology for peer to peer communication between controllers and are LONMARK certified Unless otherwise indicated the term PFCU is used in this document to represent both the SLX ASC PFCU and SLX ASC PFCU A models Likewise PTU represents both t...

Страница 2: ...electrical shock or burn Warning Symbol Significant information required Refer to Hardware Installation Guide Double Insulation Symbol These controllers are built with double insulation 4 General Wiring Recommendations Due to HIGH VOLTAGE direct contact will cause electrical shock or burn Turn off power before any kind of servicing It is recommended to use a 2 line main power disconnect to be loca...

Страница 3: ...h less than 75 23m either a shielded or unshielded 18AWG wire may be used For a wire length between 75 and 200 23 to 61m a shielded 18AWG wire is recommended The wire should be shielded on the controller side and the shield length should be kept as short as possible Wiring Digital Inputs This input configuration is used to monitor digital dry contacts as well as pulsed contacts PTU controllers onl...

Страница 4: ... to the installation guide of the equipment manufacturer Wiring Relay Contact Outputs Three 3 relay contact outputs DO1 DO3 can switch 3A inductive resistive for fan speed control up to 277VAC and one 1 relay contact output DO4 can switch 3A inductive and 10A resistive for heater control up to 277VAC Relay contact output cables must remain between 18 and 14AWG Select the proper gauge according to ...

Страница 5: ... 10VDC Universal Output Analog Actuator 11 Communications Wiring The recommended cable type for LON communications is 22AWG 0 65 mm twisted pair unshielded The LON communication wire is polarity insensitive and can be laid out in a bus star loop or free topology For loop topology polarity is important and special care must be taken when connecting the LON network to avoid a short circuit It is rec...

Страница 6: ... jumper 6 Reconnect the power The service LED will blink twice and become solid indicating that the controller is application less The proper APB using the Commission or Load option in LNS e g SLX Series LMT can now be loaded into the controller 13 Maintenance Due to HIGH VOLTAGE direct contact will cause electrical shock or burn Turn off power before any kind of servicing The PFCU and PTU control...

Страница 7: ...Page 7 of 8 15 Typical Fan Coil Application Wiring Diagram 4A Fast acting high breaking 5 x 20mm Fuse PART 216 004XP Littelfuse Fuse holder PART 3004100 Phoenix Contact 15A Fast acting high breaking 6 x 32mm Fuse PART 314015P Littelfuse Fuse holder PART 3004171 Phoenix Contact ...

Страница 8: ...etwork termination Check the termination s Incorrect or broken termination s will make the communication integrity dependent upon a controller s position on the network Extra capacitance Make sure that no extra capacitance is being connected to the network other than the standard FTT circuit and a maximum of a 3 meter stub in bus topology Number of controllers on network segment exceeded The numbe...

Отзывы: