In the event of a short-circuit to an exposed conductive part
in a TN system, a considerable proportion of the single-pole
short-circuit current is not fed back to the power source
through a connection to earth but through the protective
conductor. The comparatively high single-pole short-circuit
current allows for the use of simple protective devices such
as fuses or miniature circuit-breakers, which clear the fault
within the permissible fault disconnect time.
In building installations, networks with TN-S systems are
preferably used today. When a TN-S system is used in the
entire building, residual currents in the building, and thus
an electromagnetic interference by galvanic coupling, can
be prevented during normal operation because the operat-
ing currents flow back exclusively through the separately
laid insulated N conductor. In case of a central arrangement
of the power sources, the TN-S system can always be
recommended. In that, the system earthing is implemented
at one central earthing point (CEP) for all sources, for
example in the main low-voltage distribution system.
Please note that neither the PEN nor the PE must be
switched. If a PEN conductor is used, it is to be insulated
over its entire course – this includes the distribution system
(please refer to the example in Fig. 10/2). The magnitude of
the single-pole short-circuit current directly depends on the
position of the CEP.
Caution:
In extensive supply networks with more than one
splitter bridge, stray short-circuit currents may occur.
4-pole switches must be used if two TN-S subsystems are
connected to each other. In TN-S systems, only one earth-
ing bridge may be active at a time. Therefore, it is not
permitted that two earthing bridges be interconnected via
two conductors.
Today, networks with TT systems are still used in rural
supply areas only and in few countries. In this context, the
stipulated independence of the earthing systems must be
Fig. 10/2:
Line diagram for an earthing concept based on a central earthing point (CEP)
L
1
L
2
L
3
PEN
PE
L
1
L
2
L
3
N
PE
L
1
L
2
L
3
N
PE
L
1
L
2
L
3
L
1
L
2
L
3
L
1
L
2
L
3
PEN
PE
U
Lo
w
-v
olt
ag
e main dis
tr
ibution boar
d
Po
w
er sour
ce
Subdis
tr
ibution boar
d
C
entral
E
arthing
P
oint
M
ain
E
quipotential
B
onding conductor
Neutral choke
(no longer required
for modern systems)
Содержание Sivacon S8
Страница 1: ...Totally Integrated Power www siemens com sivacon s8 SIVACON S8 Technical Planning Information 10 2015 ...
Страница 2: ......
Страница 6: ...Chapter 1 System based power distribution ...
Страница 23: ...20 SIVACON S8 Planning Principles SIVACON S8 System overview ...
Страница 35: ...32 SIVACON S8 Planning Principles Circuit breaker design ...
Страница 93: ...90 SIVACON S8 Planning Principles Conforming to standards and design verified ...