Requirement
All shut-off valves are closed.
Procedure
To commission the pressure transmitter for gases, proceed as follows:
1.
Open both the shut-off valves
⑥
at the pressure tapping point.
2.
Open the stabilizing valve
②
.
3.
Open the differential pressure valve (
③
or
④
).
4.
Check and, if necessary, correct the zero point when the start-of-scale value is 0 kPa (4 mA).
5.
Close the stabilizing valve
②
.
6.
Open the other differential pressure valve (
③
or
④
).
5.4.3
Commissioning for liquids
Usual arrangement
Special arrangement
①
Pressure transmitter
⑦
Drain valves
②
Stabilizing valve
⑧
Gas collector vessels (optional)
③
,
④
Differential pressure valves
⑨
Differential pressure transducer
⑤
Differential pressure lines
⑩
Vent valves
⑥
Shut-off valves
Pressure transmitter below the differential pressure
transducer
Pressure transmitter above the
differential pressure transducer
Requirement
All valves are closed.