Connecting
5.2 Connecting
temperature resistance of the cable in the connection compartment in mind (With an
ambient temperature ≥ 50 °C (122 °F) the connection cable should be suitable for a
temperature which is at least 20 °C (36 °F) higher.).
Cable screening and grounding
It is recommended to connect the cable screening to ground potential on the supply
side.
Cable gland
Metric threads
In the case of transmitter housings with metric thread, the cable gland is screwed in
at the factory. It is sealed with plastic plugs as transport protection.
You have to remove this plug before electrical connection.
NPT thread
In the case of transmitter housings with self-sealing NPT threads, it is not possible to
have the cable entry screwed in at the factory. The cable gland is therefore covered
with a red dust protection cap as transport protection.
Note
To ensure the housing protection class, you must replace this protective cap with an
approved NPT cable gland before setup.
Note
Do not use grease when screwing in the NPT cable gland or a conduit steel pipe.
Maximum torque see chapter "
Technical data
"
.
5.2
Connecting
Connection technology
The voltage supply and signal output are connected via the spring-loaded terminals
in the housing.
Note
Fixed conductors and flexible conductors with ferrules can be inserted directly into
the terminal openings. In the case of flexible conductors for opening the terminals,
use a screwdriver (3 mm blade width) to push the actuator lever away from the
terminal opening. When released, the terminals are closed again.
18
SITRANS LR140
Operating Instructions, 08/2020,
A5E50352144
Содержание SITRANS LR140
Страница 6: ...Preface Editing status 2020 08 03 SITRANS LR140 Operating Instructions 08 2020 A5E50352144 v ...
Страница 7: ...Preface vi SITRANS LR140 Operating Instructions 08 2020 A5E50352144 ...
Страница 13: ...Safety notes 2 7 Security information 6 SITRANS LR140 Operating Instructions 08 2020 A5E50352144 ...
Страница 31: ...Setup with smart device Bluetooth 7 1 Connecting 24 SITRANS LR140 Operating Instructions 08 2020 A5E50352144 ...
Страница 49: ...Service and maintenance 10 2 Disposal 42 SITRANS LR140 Operating Instructions 08 2020 A5E50352144 ...
Страница 51: ...Certificates and approvals 11 2 EU conformity 44 SITRANS LR140 Operating Instructions 08 2020 A5E50352144 ...
Страница 57: ...Technical data and dimensions 12 4 Trademark 50 SITRANS LR140 Operating Instructions 08 2020 A5E50352144 ...