Connecting
5.4 Switch-on phase
5.4
Switch-on phase
After connection to the power supply, the device carries out a self-test:
• Internal check of the electronics
• Output signal is set to failure
The current measured value is then output on the signal cable.
20
SITRANS LR140
Operating Instructions, 08/2020,
A5E50352144
Содержание SITRANS LR140
Страница 6: ...Preface Editing status 2020 08 03 SITRANS LR140 Operating Instructions 08 2020 A5E50352144 v ...
Страница 7: ...Preface vi SITRANS LR140 Operating Instructions 08 2020 A5E50352144 ...
Страница 13: ...Safety notes 2 7 Security information 6 SITRANS LR140 Operating Instructions 08 2020 A5E50352144 ...
Страница 31: ...Setup with smart device Bluetooth 7 1 Connecting 24 SITRANS LR140 Operating Instructions 08 2020 A5E50352144 ...
Страница 49: ...Service and maintenance 10 2 Disposal 42 SITRANS LR140 Operating Instructions 08 2020 A5E50352144 ...
Страница 51: ...Certificates and approvals 11 2 EU conformity 44 SITRANS LR140 Operating Instructions 08 2020 A5E50352144 ...
Страница 57: ...Technical data and dimensions 12 4 Trademark 50 SITRANS LR140 Operating Instructions 08 2020 A5E50352144 ...