
Commissioning
6.2 General requirements
SITRANS F Ultrasonic flowmeters FST030 (HART)
52
Operating Instructions, 08/2017, A5E35971532-AC
6.2
General requirements
Before commissioning it must be checked that:
●
The device has been installed and connected in accordance with the guidelines provided
in Installing/Mounting (Page 31) and Connecting (Page 35).
●
Device installed in hazardous areas meets the requirements described in Installation in
hazardous areas (Page 18).
6.3
Power-up
Power up the device. Devices with local display show a screen for initial startup.
See also
Initial startup (Page 53)
6.4
Local display
The device is commissioned/operated with the touch keypad on the local display.
The elements are actuated by touching the glass panel on the appropriate key. Pressing
harder will not activate the key, but using a thumb instead of a finger tip will help. The text
display above the operating elements gives a menu-guided operation of the individual device
function/parameters. Successful operation of the key is confirmed by a small green LED at
the right of the display.
①
Full graphical display
②
LED (for indication of key operation)
③
Touch keypad
Figure 6-1
Local display