Installing the S7-400
2-25
S7-400 and M7-400 Programmable Controllers Hardware and Installation
A5E00069481-04
2.10
Installing the Cable Duct
Procedure
1. Install the cable duct in the 19-inch pitch directly under the rack or between two
racks. Use M6 size screws for mounting.
The following figure shows how to mount the cable duct between two racks.
9 10 11 12 13 14 15 16 17 18
9 10 11 12 13 14 15 16 17 18
19-inch reference level
Содержание Simatic M7-400
Страница 10: ...Preface x S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 20: ...Contents xx S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 66: ...Installing the S7 400 2 40 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 74: ...Addressing the S7 400 3 8 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 118: ......
Страница 170: ...Starting Up 6 20 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 194: ...Maintenance 7 24 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 252: ...Assembling the M7 400 8 58 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 310: ...Glossary Glossary 18 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 316: ...Index Index 6 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...