Connection
4.12 Connecting the Power Module with the CM PM-E Direct Connection Module
ET 200pro distributed I/O system
130
Operating Instructions, 03/2013, A5E00335544-08
4.12
Connecting the Power Module with the CM PM-E Direct Connection
Module
Introduction
Connect the 2L+ load voltage supply to the screw terminals of the CM PM Direct connection
module. You can use additional terminals to loop through the load voltage supply.
Requirements
●
The power module and bus module are mounted on the rack.
●
Wiring rules for the 2L+ load voltage supply screw terminals:
Wiring rules
Screw terminals for the supply
voltages
Connectable conductor
cross-sections of flexible
cables
Without end sleeve
0.14 to 2.5 mm
2
With end sleeve
0.14 to 2.5 mm
2
Number of conductors per terminal
1 conductor
Stripped length of the cable insulation
11 mm
End sleeves according to
DIN 46228
Without insulating collar
Design A, length up to 12 mm
With insulating collar
Design E, length up to 12 mm
Required tools
●
Cross-tip screwdriver, size 2
●
Screwdriver with 3 mm blade
●
25 mm open-end wrench
Содержание Simatic ET200pro
Страница 8: ...Preface ET 200pro distributed I O system 8 Operating Instructions 03 2013 A5E00335544 08 ...
Страница 16: ...Table of contents ET 200pro distributed I O system 16 Operating Instructions 03 2013 A5E00335544 08 ...
Страница 152: ...Configuring 5 2 PROFINET IO ET 200pro distributed I O system 152 Operating Instructions 03 2013 A5E00335544 08 ...
Страница 188: ...Functions 8 2 PROFINET IO ET 200pro distributed I O system 188 Operating Instructions 03 2013 A5E00335544 08 ...
Страница 545: ...Index ET 200pro distributed I O system Operating Instructions 03 2013 A5E00335544 08 545 ...