C7-626 / C7-626 DP Control Systems
C79000-G7076-C626-01
2.11.1
With a Loaded Configuration in the C7 OP
After applying the power supply the C7 carries out a self-test. The test checks
the functionality of the most important device components and displays the
results of the test via the LED status and the display screen. The following
startup will be carried out:
1. The C7 carries out a self test after power on.
2. The C7 carries out an operating system test for both parts (C7 CPU and
C7 OP).
3. During the start-up phase (1 and 2) the C7 CPU remains in STOP mode.
Once the C7 OP has been started up, the following basic screen will be
displayed:
399 Startup complete
!
Basic C7-626 picture
1
2
3
4
5
Softkey
icons for
selecting
standard
pictures
Figure 2-13 Basic C7 Picture (Example)
4. Confirm the displayed message by pressing
.
Starting Up
Installing and Preparing the C7
Содержание SIMATIC C7-626
Страница 18: ...1 1 6 C7 626 C7 626 DP Control Systems C79000 G7076 C626 01 Product Overview ...
Страница 72: ...3 3 26 C7 626 C7 626 DP Control Systems C79000 G7076 C626 01 Configuring MPI Networks and PROFIBUS DP Networks ...
Страница 78: ...4 4 6 C7 626 C7 626 DP Control Systems C79000 G7076 C626 01 Connecting a Programming Device PC to a C7 ...
Страница 122: ...A A 8 C7 626 C7 626 DP Control Systems C79000 G7076 C626 01 General Technical Specifications ...
Страница 138: ...Glossary 10 C7 626 C7 626 DP Control Systems C79000 G7076 C626 01 Glossary ...
Страница 142: ...Index 4 C7 626 C7 626 DP Control Systems C79000 G7076 C626 01 Index ...