16 Appendix
V2.0 V2.1 V2.2 V2.3 V2.4 V2.5 V2.6 V3.0 V3.1 V3.2 V3.3 V3.5 V3.6 V3.7
06.96 08.96 01.97 5. 97 10.97 04.98 10.99 10.01 4.02 02.03 04.04 08.05 04.06 03.07
Zone operating panel (BBF)
BBF detector zone formation
Freely programmable BBF function
keys
BMT information panel
Operation and observation
Alarm counters (VdS)
Information list
Operating input
Control centre operating panel
Local operating panel
Mobile operating panel
Spur operating panel
GMA operating panel
Control centre operating panel
Operating panel responsibility (ad-
justable)
Printer responsibility
Default printer via DPU
GMA user interface
VdS alarm counters
General counters
DIN alarm counters
Fire brigade operating panel
SIGMASYS C operat. panel with 6
funct. keys
Alerting
Key depot connection
AT release, local
AT release, local or remote
Second AT for BMT
AT response time (adjustable)
Freely programmable AT releases
Local alerting facilities
Controlling
Event display (direct control)
Detector display (direct control)
Control via detector output
Total outputs
Cross-loop control
Cross-control and indicating panel
control
Cross-BMT/IMT control
SIGMALINK object-based control
from SM88
Monitored control facility
FSA
Multifunctional Danger Control and Indicating Panels SIGMASYS C and M (M-Modules)
115 / 128
Best.Nr. A24205-A337-B970 – Edition 12 (03/07)
Содержание SIGMASYS C
Страница 4: ......
Страница 30: ......
Страница 38: ......
Страница 44: ...6 Functions 36 128 BMT Project Planning Guidelines Best Nr A24205 A337 B970 Edition 12 03 07 ...
Страница 48: ......
Страница 62: ......
Страница 84: ......
Страница 110: ......
Страница 120: ...15 Project planning examples 112 128 BMT Project Planning Guidelines Best Nr A24205 A337 B970 Edition 12 03 07 ...
Страница 128: ...16 Appendix 120 128 BMT Project Planning Guidelines Best Nr A24205 A337 B970 Edition 12 03 07 ...
Страница 130: ......
Страница 132: ......
Страница 134: ......
Страница 137: ......