SATURN
EPABX
installation Test Procedures
Issue 1, May
.
1 . 0 1
Purpose. The equipment comprising the SATURN
(SATURN Ii-Expanded) System is
tested at the fac-
tory prior to shipment. The inspections and tests covered in
this practice verify that the EPABX equipment has been
properly installed; ensure that no damage
dur-
ing transit; and confirm that the sysiem is completely opera-
tional. Table 1.00 defines the mnemonics usedthroughout
practice.
CAUTION
test procedures on
the
must be performed only
by
personnel.
1 . 0 2
This practice is
into the following sec-
tions which are presented in the sequential order of
after initial installation of a SATURN
System. When
additional equipment is installed to an existing and active
SATURN
System, it is the responsibility of craft person-
nel to determine the sequential order of the test procedures
contained in
sections.
ACD
Disiribution
Alarm
ASCII
American Standard Code for Information
Controller/Input-Ouiput
CMU
Customer Memory Update
c o
Central Office
CONF
Conference Module
C O T
Central Office Trunk
DCI
Data Communication Interface
DID
Direct Inward Dialing
D I P
Dual
Package
D P
Dial Pulse
D T E
Terminal Equipment
D T M F
Dual Tone Multifrequency
E I A
Electronics Industries Association
E P A B X
Electronic Private Automatic Branch Exchange
FDD
Floppy Disk Drive
Input Random Access Memory
L T U
Line/Trunk Unit
L T U P S
Line/Trunk Unit Power Supply
LED
Light-Emitting Diode
MCA
Memory Control and Attenuation
Main Distribution Frame
25Gkb Memory
Memory
MOS
Metal Oxide Semiconductor
MRA
Material Return Authorization.
M S M
Memory Support Module
M T C E
Maintenance
Out-of-Service
Output Random Access Memory
P A B X
Private Automatic Branch Exchange
PCB
Printed Circuit Board
P E N
Port Equipment Number
Premium Instrument Module Digital
Parallel/Serial Converter
Power Supply Unit
a. Section
Introduction
b. Section 2.00
Preparatory
c. Section 3.00 Ground Tests
d. Section 4.00 Power-Up Tests
e. Section 5.00 Operating Program Loading
f. Section
On-Lina Diagnostic Tesis
Section 7.00
Test
Checklist
7 . 0 3
Siemens SATURN
The practices, issue
numbers and dates for the SATURN
EPABX are
in the
P r a c t i c e s D o c u m e n t a t i o n I n d e x
A l -
ways refer to the !aiest issue of the application
to ob-
tain the latest issue number of a practice.
S i e m e n s
S e r v i c e s .
maintains a nationwide network
field
offices. Con-
tact the Siemens regional
for any engineering
that may be
1.00 Mnemonics Used in This Practice
i - i