113/118
Siemens Building Technologies
Basic Documentation RVL471
CE1P2524E
HVAC Products
Alphabetical list of operating lines
23.10.2002
Alphabetical list of operating lines
Function, setting, display
Operating line
Page
0 to 10
1. Third heating period, start of REDUCED heating
6
30
2. Third heating period, start of NORMAL heating
7
30
2. Third heating period, start of REDUCED heating
8
30
3. Third heating period, start of NORMAL heating
9
30
3. Third heating period, start of REDUCED heating
10
30
A
Actuator closing time
133
77
Actuator opening time
134
77
Actuator running time
85
48
Assignment of d.h.w. heating
121
64
B
Boost of room temperature setpoint
71
37
Building time constant
63
37
Bus power supply
179
84
C
Circulating pump operation during the legionella function
150
81
Clock mode
178
84
Controller’s software version
195
84
D
Date
40
33
Date of first day of holiday
12
30
Date of last day of holiday
13
30
DC 0–10 V heat demand output U
X
181
84
Derivative action time control (Tv)
137
78
Device number
169
84
D.h.w. charging
125
72
D.h.w. charging temperature boost
127
72
D.h.w. priority, flow temperature setpoint
124
69
D.h.w. temperature
27
32
D.h.w. temperature sensor / control thermostat
126
72
Dwelling time at legionella setpoint
149
81
E
End of first ON period
153
83
End of first ON period
33
33
End of second ON period
155
83
End of second ON period
35
33
End of third ON period
37
33
End of third ON period
157
83
F
Flow alarm
171
84
Flow temperature boost mixing valve / heat exchanger
132
77
Flow temperature boost mixing valve / heat exchanger
84
48