RUGGEDCOM WIN5237
Installation Guide
Chapter 2
Installing the Subscriber Station
Unpacking the Subscriber Station
7
2. Unpack and inspect the subscriber station components. For more information, refer to
“Unpacking the Subscriber Station”
3. Mount the subscriber station to a pole, wall or tower. For more information, refer to
.
4. Assemble the PoE cable. For more information, refer to
Section 2.8.3, “Assembling the PoE Connector”
5. Make sure the subscriber station is grounded. For more information, refer to
6. Connect the subscriber station to a power source and the network. For more information, refer to
7. Seal all cable connections. For more information, refer to
Section 2.9, “Weatherproofing the Subscriber
8. Configure the subscriber station. For more information, refer to
Section 2.10, “Configuring the Subscriber
Section 2.2
Unpacking the Subscriber Station
The following items are included in the RUGGEDCOM WIN5237 package:
• RUGGEDCOM WIN5237 Subscriber Station
• RUGGEDCOM WIN1010 AC Power Injector
• 2 × Radio Frequency (RF) antenna cables, 5 m (16.4 ft) long
• Pole/wall/tower mounting kit
• RJ45 PoE connector kit
When unpacking the subscriber station, do the following:
1. Inspect the package for damage before opening it.
2. Visually inspect each item in the package for any physical damage.
3. Verify all items are included.
If any item is missing or damaged, contact Siemens for assistance.
Section 2.3
Required Tools and Materials
The following tools and materials are required to install the RUGGEDCOM WIN5237:
Kits
• Class I, Division 2 Kit (P/N MKIT0090) – For hazardous
locations only
Tools
• Wrench or socket set
• Phillips screwdriver
• Drill with an 8 mm (5/16 in) drill bit
Greases
• Marine grease (for marine applications only)
Tapes
• POE cold shrink (maximum 49.2 mm or 1.9 in inner
diameter before shrinking) or self-amalgamating tape
• UV-resistant vinyl tape
• Electrical insulation putty