Installing Device
2.1 General Procedure
of a tool, lock and key, or other means of security, and controlled by the authority
responsible for the location.
2.1
General Procedure
The general procedure for installing the device is as follows:
1.
Review the relevant certification information for any regulatory
requirements.
For more information, refer to
.
2.
Unpack and inspect the device.
For more information, refer to
"Unpacking the Device (Page 10)"
3.
Mount the device.
For more information, refer to
"Mounting the Device (Page 11)"
4.
Connect the failsafe alarm relay.
For more information, refer to
"Connecting the Failsafe Alarm Relay (Page
5.
Connect power to the device and ground the device to safety Earth.
For more information, refer to
6.
Connect the device to the network.
For more information, refer to
7.
Configure the device.
For more information, refer to
"Configuring the Device (Page 24)"
.
2.2
Unpacking the Device
When unpacking the device, do the following:
1. Inspect the package for damage before opening it.
2. Visually inspect each item in the package for any physical damage.
3. Verify all items are included.
Note
If any item is missing or damaged, contact Siemens for assistance.
10
RUGGEDCOM RS416PF
Installation Manual, 04/2021, C79000-G8976-1355-04
Содержание RUGGEDCOM RS416PF
Страница 9: ...Preface Contacting Siemens viii RUGGEDCOM RS416PF Installation Manual 04 2021 C79000 G8976 1355 04 ...
Страница 17: ...Introduction 1 6 3 IEEE 1588 Support 8 RUGGEDCOM RS416PF Installation Manual 04 2021 C79000 G8976 1355 04 ...
Страница 31: ...Installing Device 2 6 3 Wiring Examples 22 RUGGEDCOM RS416PF Installation Manual 04 2021 C79000 G8976 1355 04 ...