NXAirS description

12. Safety instructions

Danger! 
HV! Danger!

 Don't touch the living part
 Assure panel be operated by qualified person

To operate the panel correctly and safely, it is a must to obey the following:

 Get the panel installed correctly according to the operation manual

Danger! 
Some part of the device will be up to dangerous voltage when the device and switchgear panel 
in operation. Mechanism acts very quickly, even remote control can be operated.

 Don't remove cover.
 Don't put hand in the hatch.
 Don't touch the pole and insulated draught stick of VCB

13. Operation

13.1 Operating components on the panel

Door of the low-voltage compartment
Locking device of the low-voltage compartment
Protection device
Capacitive voltage detector for busbar compartment and cable 
connection compartment.
Door of the high-voltage compartment
Locking device of the high-voltage compartment
Opening for spring charge
Door knob for opening the high-voltage door
Actuating openings for the circuit-breaker
Actuating openings for the earthing switch
"Close/open" indication of earthing switch
Sliding cover of the actuating openings for the earthing switch
Sliding cover of the actuating openings for the circuit-breaker
Operating cycle counter of the circuit-breaker
“Spring charged” indication
Indication of circuit breaker
“OFF” actuating opening for circuit breaker
“ON” actuating opening for circuit breaker

1
2
3
4

5
6
7
8
9

10
11
12
13
14
15
16
17
18

Figure 5. 

Operating components on the panel

“CLOSED/OPEN” indication of the circuit-breaker and earthing switch

Circuit-breaker 

closed 

open

Earthing switch 

closed 

open

Spring status 

charged 

uncharged

13

18
17
16
15
14

10

12

11

2

1

3

4

5

6

7

8
9

Содержание NXAirS

Страница 1: ...www siemens com cn Type NXAirS Withdrawable Metal Enclosed Medium Voltage Switchgear up to 12kV Air insulated Answers for infrastructure and cities ...

Страница 2: ...mpartment 8 7 2 Circuit Breaker module SION 9 7 3 Busbar compartment 9 7 4 Cable connection compartment 9 7 5 Low voltage compartment 9 7 6 Additional compartment to the busbar compartment optional 10 8 Interlocks 10 9 Accessories 11 10 Technical data 11 10 1 Panel 12 10 2 SION 12 10 3 Climate and ambient conditions 13 11 Service Information 13 11 1 Maintenance 13 11 2 Panel connection 13 11 3 Spa...

Страница 3: ...3 7 Open the Circuit Breaker 21 13 8 Charging the spring manually 22 13 9 Feeder earthing 23 13 10 Disconnect the earthing of feeder 24 13 11 Cable channel 25 13 12 Inserting SION module 26 13 13 Operation procedure of NXAirS service truck 29 13 14 Operation of shutters 30 13 15 Operation of motor driven 31 14 Service 31 14 1 Maintenance of Switch panel 32 14 2 Maintenance of SION 33 15 Troublesho...

Страница 4: ...ts electric indicators and shockproof metal enclosure of living parts if all operations are according to these regulations Caution The precondition for normally and safely operating of the panel is as the following Observe the instructions of operation and installation Operated by qualified professional person Correct conveyance and professional installation of the switchgear panel Professional as...

Страница 5: ...rom the front of the panel The operation handle holes and control units are clearly allocated beside the mechanical indicators There are mechanical indicators of switch on mimic diagram Manual Motor driven cassettee and earthing switch Flexibility Panel can be wall mounted or not Cable connection can be done from both front and rear of the panel Middle place withdrawable panel Connection of all no...

Страница 6: ...ting module panel is an additional module to the basic module It s used to carry electrical power It can not switch on electrical power The withdrawable part in the disconnecting module NXAirS is therefore protected by a padlock against arbitrary operation standard construction Busbar Disconnecting module panel Low voltage plug connector with mechanical interlock between module and panel Mechanism...

Страница 7: ... is powder coated with epoxy resin Individual self supporting modular compartments in solid wall design Compartments are bloted together The sheet between compartments can withstand pressure of arcing Each compartment relieves pressure upwards 1 Low voltage plug connector 2 Drive and interlock unit of the circuit Breaker 3 Vacuum interrupter 4 Fix and move contact 5 The operation mechanism of circ...

Страница 8: ...se or tripping coil Operation cycle counter Indicate device of switch status Electrical tripping prevention Voltage sensitivity resistance module when the auxiliary voltage 60V Electromagnetic interlock The secondary release Low voltage release CT drive release Circuit breaker Circuit breaker can be operated by button or electronic remote controller The energy for the open close open procedure qui...

Страница 9: ...hing switch Cable type CT at the bottom of the connection compartment Natural ventilation current above 2500A Heating device Motor driven earthing switch 7 5 Low voltage compartment Completely separated from the other compartments and removable For installation of protection control measuring and metering equipment Plug is adapted to connection of conductor and control cable 705 mm is the standard...

Страница 10: ...reaker Withdrawable module at disconnected or service position Open the Circuit breaker None Close the earthing switch Withdrawable module at disconnected position of interlock Close the busbar earthing switch No power of main busbar Open the front door Withdrawable module at disconnected position Mechanical interlocks operation Additional preconditions Move the withdrawable module manually extern...

Страница 11: ... 3150A Panel 1000 Substation transformer 1000 metering Panel 800 Height lk 31 5kA ln 2500A 2200 lk 31 5kA ln 3150A 2400 lk 40kA 2300 Depth lk 31 5kA ln 3150A lb 3150A 1500 lk 31 5kA ln 2500A lb 2500A 1350 lk 31 5kA ln 3150A lb 3150A 1500 lk 40kA 1500 Height Minimum dimension 2800 Width operation area Minimum dimension for 800 width panel 1350 Minimum dimension for 1000 width panel 1550 Standard IP...

Страница 12: ... Figure 3 Nameplate 10 3 Climate and ambient conditions The switchgear may be used subject to possible additional measures under the following climate classes and ambient conditions Climate classes according to IEC 60721 3 3 3K3 3K5 3KX Ambient conditions Natural foreign materials Chemically active pollutants Small animals For detailed information please refer to catalogue 7 1 2 3 4 5 6 Figure 4 D...

Страница 13: ... and components Switching compartment and cable connection compartment adapt side board design double metal Partition between compartments The cable connection compartment and switching compartment keep separated when compartment is taken away For the standard scheme there is no metal Partition between the compartments of the busbar area When change compartment please consult our company Separated...

Страница 14: ...on device Capacitive voltage detector for busbar compartment and cable connection compartment Door of the high voltage compartment Locking device of the high voltage compartment Opening for spring charge Door knob for opening the high voltage door Actuating openings for the circuit breaker Actuating openings for the earthing switch Close open indication of earthing switch Sliding cover of the actu...

Страница 15: ...ls are fittings Drawing 6 Operating handle for push in and pull out circuit breaker Drawing 7 Operating pole for circuit breaker used for manual open close from outside of the cabinet Drawing 8 Operating handle for earthing switch of feeders Drawing 9 Manual operating crank for energy storage spring when circuit breaker is at working position ...

Страница 16: ...Close HV door Preconditions without SION module or Insert SION module according to descriptions on Page 25 and 26 Insert secondary plug Pull the handle downwards and the door closes Turn the key clockwise by 90 and take out the key 13 4 Push SION module to service position Preconditions Place the module into the panel Insert the secondary plug HV door is closed Circuit breaker is in open position ...

Страница 17: ...on ensure to perform necessary external unlock at first Open the padlock option Push upwards the sliding baffle plate Insert the handle of SION module to the operating shaft and turn it clockwise to the limit place Attention Only when SION module is positioned in stable limit place all interlocks can be unlocked SION module must be moved to its limit place Take out the operating handle Sliding baf...

Страница 18: ... of SION module to the operating shaft and turn it clockwise to the limit place Take out the operating handle Sliding baffle plate will close automatically Lock up the padlock option SION module is pushed to test position from the working position 13 5 Push SION module to test position Place the module into the panel Close the HV door The module is in working position Circuit breaker is in open po...

Страница 19: ...o 1 from 0 Recorder of operating times adds 1 Circuit breaker is closed Take out the operating pole from the operating hole Electrical operation Removable part is in working position or test position Spring has enough energy HV door of switch cabinet is closed Preconditions for this operation Danger The unstable auxiliary voltage will impact the electrical interlock and mechanical interlock If the...

Страница 20: ...electrical interlock and mechanical interlock If the interlock mechanism moves upwards manual operation is not allowed due to the electrical interlock Prior to manual operation ensure to perform necessary external unlock at first Drawing 13 Mechanical open of circuit breaker Operating procedure Close open indicator changes to 0 from 1 Circuit breaker is open Take out the operating pole from the op...

Страница 21: ...conditions Drawing 15 Operating hole for manual energy storage of closing spring Danger The sudden race rotation of the handle will result in hurt to persons When use the handle for energy storage of spring pay attention to prevent the race rotation of the handle for when the control voltage is connected again motor rotation the return rotation of the handle will hurt persons During manual energy ...

Страница 22: ...r The unstable auxiliary voltage will impact the electrical interlock and mechanical interlock If the interlock mechanism moves upwards manual operation is not allowed due to the electrical interlock Please pay attention to the five safety rules refer to Page 3 Normal description Prior to manual operation ensure to perform necessary external unlock at first Operating procedures Attention If the op...

Страница 23: ... occurred Operating handle cannot be taken out in the middle position Operating handle cannot be taken out in the middle position Operating hole of earthing switch for feeders and the indicator for switch status are located at the lower left of handcart room door Operating hole is blocked by an additional sliding baffle plate Danger The unstable auxiliary voltage will impact the electrical interlo...

Страница 24: ... operating handle anticlockwise by 90 Indicator for switch status displays 0 Earthing switch is open Take out the operating handle Sliding block of operating hole is closed Lock up the padlock option 13 11 Cable channel If the earthing condition is available close the earthing switch of feeder refer to Page 21 13 9 Earthing of feeders Open the HV door refer to Page 15 Open the HV door Take out SIO...

Страница 25: ...take out the separator plate Please pay attention to the five safety rules refer to Page 3 Normal description Ensure there is no voltage At this time work planned in cable room can be accomplished 13 12 Inserting SION module Place SION module on maintenance truck then push the SION module into truck compartment refer to Page 25 13 13 Operating procedures of NXAir S service truck Code Mechanical co...

Страница 26: ... panel 1 Place the service truck with VCB in front of the panel 2 Lock poles at both sides of service truck can match with location holes on guide rail through the lifting mechanism so that lock poles can be inserted into location holes smoothly 3 When service truck contacts with the panel completely interlock mechanism will move back automatically interlock shaft releases VCB Rotate handles of lo...

Страница 27: ... into the panel and lock it 5 Support to service truck is adjusted downwards slightly through the lifting mechanism 6 Unlock the interlock of service truck move outward the handles of lock poles at the both sides then the service truck can be moved 7 Connect the secondary plug 8 Close the front door Operation of NXAirS ...

Страница 28: ...hen service truck contacts with the panel completely interlock mechanism will move back automatically interlock shaft extends into the guide rail Rotate handles of lock poles at both sides inward and lock the service truck 5 Unlock the interlock handle of VCB push VCB into the rail of service truck and lock it in the interlock hole 6 Support to service truck is adjusted upwards slightly through th...

Страница 29: ...e from test position to working position busbar movable shutter and feeder movable shutter will open automatically and keep in fully open position 2 When push SION module from working position to test position busbar movable shutter and feeder movable shutter will close automatically 3 Busbar movable shutter and feeder movable shutter can be operated independently i e open or close and without inf...

Страница 30: ...n will be prohibited 13 15 2 Electrical operation of the removable part Operating procedure Preconditions for the operation Turn the change over switch to electrical operation Interlock conditions must be met Check whether change over switch is in electrical operation position or earthing switch is open Return from working position to test position press cart exit button in front of the panel Turn...

Страница 31: ...ontact of main circuit a fix contact of earthing switch f and other parts with frication such as driving shaft of movable door mechanism s and travel rail d a and f shall adopt Dose Long term2 s and d shall adopt Isoflex Topas L32 Besides periodic maintenance if any fault occurred causes for faults and short circuits must be investigated immediately and damaged equipment must be replaced at once E...

Страница 32: ...ch panel After check put the switch panel into operation again 14 2 Maintenance of SION Preconditions Switch off the power supply Circuit breaker is open Spring without energy We suggest performing visual check periodically To reach the optimum insulation effect insulation parts must be kept clean Insulation parts shall be cleaned by wet cloth and moderate detergent such as canned detergent If oth...

Страница 33: ... open position Operating handle is inserted into the manual operating hole of feeder earthing switch The operating handle shall be inserted into correct hole Feeder earthing switch is not disconnected Disconnect the earthing switch for feeder One interlock on control panel is not unlocked Unlock the interlock on control panel Without control voltage Restore control voltage Door for HV compartment ...

Страница 34: ...ocedures Without control voltage Restore the control voltage Feeder earthing switch cannot be opened electric failure Without control voltage Restore the control voltage Operating handle for removable part is still inserted in the hole Take out the operating handle for removable part One interlock on control panel is locked up Unlock this interlock according to normal operation procedures Earthing...

Страница 35: ...sition switch is not switched over 3 Secondary wiring is incorrect communication wiring is reversed 2 Manual operation is available for the earthing switch but electric operation is impossible 1 The circuit breaker is not fully in the test position 2 Rear door of the cable compartment is not closed 3 Secondary wiring is incorrect Possible phenomena in the operation process If the problem still exi...

Страница 36: ...ndustrial Area Jiangsu Suzhou 0512 6288 8191 ext 8316 0512 6661 4898 Guangzhou 8F 10F Teem Tower Teemall No 208 Tianhe Road Tianhe District Guangzhou City 020 3718 2888 020 3718 2107 Fuzhou 21F Zhongyin Building No 136 of Wusi Road Fuzhou City 0591 8750 0888 0591 8750 0333 Xiamen Room 2111 2112 21F Bank Center No 189 Xiahe Road Xiamen 0592 268 5508 0592 268 5505 Foshan Block K 19F Dongjian Buildin...

Отзывы: