C SET THE DEMAND LIMIT
01298
C
01300
PDLSET(”%X%ARE”, ”%X%EX”, ”%X%SP1”, ”%X%TM1”, ”%X%SP2”, ”%X%TM2”)
01394
C
01396
C POWER CONSUMPTION TARGETS
01398
C
01400
PDLDPG(”%X%ARE”, ”%X%KW1”, ”%X%TG1”)
10000
GOTO 1000
The PDLMTR statement can use a demand (for example, kW, kVa) from the power
meter for peak demand limiting applications. The summation of power meter
accumulator (HI and LO) points should not be used for peak demand limiting
applications due to summation round-off error in analog point.
You can use the power meter in the APOGEE Peak Demand Limiting (PDL)
Application to gain this benefit. For more information on the PDL application, see the
APOGEE Field Panel User’s Manual
(125-3000).
Data Reliability
Many power meter/field panel applications require “high data reliability”. This means
that trend data collection must be configured to reduce the risk of data loss. To reduce
the risk of data loss, schedule trend data collection for regular intervals (for example,
every two hours) or use the Trend Buffer Full option to upload trend data to the Insight
workstation. To facilitate long-term data collection, schedule trend data conversions
daily at the Insight workstation in order to store trend data in the .CSV file format on
hard disk. At a later date, the .CSV files can be imported into a report application to
develop load profiles, cost allocation, or tenant billing reports.
Power Failure
On power failure, the power meter retains the last observed kWh value in nonvolatile
memory. All other values are instantaneous in nature and not stored during power
failure.
Содержание MD-P1
Страница 1: ...125 201 Smart Infrastructure 09 30 2019 125 201 Rev DA MD P1 and MD P1D Model Power Meters User Guide ...
Страница 27: ...Installation MD P1 and MD P1D Power Meters Wiring Diagrams 27 Siemens Industry Inc 125 201 09 30 2019 ...
Страница 28: ...Installation MD P1 and MD P1D Power Meters Wiring Diagrams 28 Siemens Industry Inc 125 201 09 30 2019 ...
Страница 29: ...Installation MD P1 and MD P1D Power Meters Wiring Diagrams 29 Siemens Industry Inc 125 201 09 30 2019 ...
Страница 44: ...Appendices Appendix C MD P1D with Visual Display 44 Siemens Industry Inc 125 201 09 30 2019 ...
Страница 70: ...Appendices Appendix G MD P1D with Visual Display 70 Siemens Industry Inc 125 201 09 30 2019 ...
Страница 75: ...Glossary 2 75 Siemens Industry Inc 125 201 09 30 2019 ...