
MD
-P1
Po
in
t
M
a
p
b
y
Ap
p
lic
a
tio
n
Nu
m
b
e
r wi
th
Po
in
t
M
a
p
Co
m
p
a
ri
s
o
n
Sup
po
rted
P1
App
li
c
a
tio
n
s
1
S
iem
e
n
s
In
d
u
s
try
, I
n
c
.
35
9
/3
0
/2019
125
-201
P1
Point
Point
Type
Type
No.
P1 Name
Units
Default
Value
Detail
Slope
for P1
Apps
Intercept
for P1
Apps
MD-P1
Series**
Apps
2771-
2777
MD-P1
Series*
*
App
2779
DEM1000*
Apps 710-
716
DEM2000*
Apps 717-
723
42
LAI
3
KVAR DEM MAX
kVAR
0
System Maximum Instantaneous
Reactive Power Demand
= maximum demand value read
since startup or reset of demand
register
0.1
0
∙
∙
43
LAI
3
KVAR DEM NOW
kVAR
0
System Average Reactive Power
Demand
returns new value every minute, will
compare and post to min/max
registers
0.1
0
∙
∙
44
LAI
3
KVARH NET LO
kVARh
0
System Total Net Reactive Energy
LSW
= unsigned value of ABS(kVARh
L1)+ABS(kVARh L2)+ABS(kVARh
L3)
1
0
∙
∙
45
LAI
3
KVARH NET HI
kVARh
0
System Total Net Reactive Energy
MSW
= unsigned value of ABS(kVARh
L1)+ABS(kVARh L2)+ABS(kVARh
L3)
1
0
∙
∙
46
LAI
3
KVAR SYS NET
kVAR
0
System Net Total Reactive Power
= signed net value of ABS(kVAR
L1)+ABS(kVAR L2)+ABS(kVAR L3)
0.1
0
∙
∙
47
LAI
3
KWH NT P LO
kWh
0
System Net Lowest Positive True
Energy
1
0
∙
∙
48
LAI
3
KWH NT P HI
kWh
0
System Net Highest Positive True
Energy
1
0
∙
∙
49
LAI
3
KWH NT N LO
kWh
0
System Net Lowest Negative True
Energy
1
0
∙
∙
50
LAI
3
KWH NT N HI
kWh
0
System Net Highest Negative True
Energy
1
0
∙
∙
51
LAI
3
KW NET POS
kW
0
System Net Positive Power
0.1
0
∙
∙
52
LAI
3
KW NET NEG
kW
0
System Net Negative Power
0.1
0
∙
∙
Содержание MD-P1
Страница 1: ...125 201 Smart Infrastructure 09 30 2019 125 201 Rev DA MD P1 and MD P1D Model Power Meters User Guide ...
Страница 27: ...Installation MD P1 and MD P1D Power Meters Wiring Diagrams 27 Siemens Industry Inc 125 201 09 30 2019 ...
Страница 28: ...Installation MD P1 and MD P1D Power Meters Wiring Diagrams 28 Siemens Industry Inc 125 201 09 30 2019 ...
Страница 29: ...Installation MD P1 and MD P1D Power Meters Wiring Diagrams 29 Siemens Industry Inc 125 201 09 30 2019 ...
Страница 44: ...Appendices Appendix C MD P1D with Visual Display 44 Siemens Industry Inc 125 201 09 30 2019 ...
Страница 70: ...Appendices Appendix G MD P1D with Visual Display 70 Siemens Industry Inc 125 201 09 30 2019 ...
Страница 75: ...Glossary 2 75 Siemens Industry Inc 125 201 09 30 2019 ...