
MD
-P1
Po
in
t
M
a
p
b
y
Ap
p
lic
a
tio
n
Nu
m
b
e
r wi
th
Po
in
t
M
a
p
Co
m
p
a
ri
s
o
n
Sup
po
rted
P1
App
li
c
a
tio
n
s
1
S
iem
e
n
s
In
d
u
s
try
, I
n
c
.
37
9
/3
0
/2019
125
-201
P1
Point
Point
Type
Type
No.
P1 Name
Units
Default
Value
Detail
Slope
for P1
Apps
Intercept
for P1
Apps
MD-P1
Series**
Apps
2771-
2777
MD-P1
Series*
*
App
2779
DEM1000*
Apps 710-
716
DEM2000*
Apps 717-
723
Power
67
LAI
3
KVA DEM MAX
kVA
0
System Maximum Instantaneous
Apparent Power Demand
= maximum demand value read
since startup or reset of demand
register
0.1
0
∙
∙
68
LAI
3
KVA DEM NOW
kVA
0
System Average Apparent Power
Demand
returns new value every minute, will
compare and post to min/max
registers
0.1
0
∙
∙
69
LAO
4
DATA SCALAR
3
A Value of 0-6 that changes the
scaling of certain registers.
1
0
∙
70
LAO
4
DEMAND WIN
min
15
Demand window size in minutes;
default is 15 minutes.
1
0
∙
∙
71
LAO
4
VOLT MULT
1
Multiply volts values by this scalar.
Use with Step-down Transformer.
Affects all parameters that use volts
(such as, kW).
1
0
∙
∙
72
LDO
2
CTA TYPE
1
Select 1 = mV CT (on text = "MV")
or 2 = Rogowski CT (off text =
"ROGO")
1
0
∙
73
LDO
2
CTB TYPE
1
Select 1 = mV CT (on text = "MV")
or 2 = Rogowski CT (off text =
"ROGO")
1
0
∙
74
LDO
2
CTC TYPE
1
Select 1 = mV CT (on text = "MV")
or 2 = Rogowski CT (off text =
"ROGO")
1
0
∙
75
LAO
4
CTA VALUE
A
100
Fractional part of NV_CT1
1
0
∙
76
LAO
4
CTB VALUE
A
100
Fractional part of NV_CT2
1
0
∙
77
LAO
4
CTC VALUE
A
100
Fractional part of NV_CT3
1
0
∙
Содержание MD-P1
Страница 1: ...125 201 Smart Infrastructure 09 30 2019 125 201 Rev DA MD P1 and MD P1D Model Power Meters User Guide ...
Страница 27: ...Installation MD P1 and MD P1D Power Meters Wiring Diagrams 27 Siemens Industry Inc 125 201 09 30 2019 ...
Страница 28: ...Installation MD P1 and MD P1D Power Meters Wiring Diagrams 28 Siemens Industry Inc 125 201 09 30 2019 ...
Страница 29: ...Installation MD P1 and MD P1D Power Meters Wiring Diagrams 29 Siemens Industry Inc 125 201 09 30 2019 ...
Страница 44: ...Appendices Appendix C MD P1D with Visual Display 44 Siemens Industry Inc 125 201 09 30 2019 ...
Страница 70: ...Appendices Appendix G MD P1D with Visual Display 70 Siemens Industry Inc 125 201 09 30 2019 ...
Страница 75: ...Glossary 2 75 Siemens Industry Inc 125 201 09 30 2019 ...