Commissioning a project
6.4 Transfer
Basic Panels
94
Operating Instructions, 04/2012, A5E02421799-03
Procedure (WinCC flexible)
Proceed as follows:
1.
On the configuring PC, select the "Transfer settings" command from the "Project >
Transfer" menu in WinCC flexible.
The "Select devices for transfer" dialog opens.
2.
Select the HMI device in the left area of the dialog.
3.
Select the type of interconnection for the HMI device and the configuring PC.
Set the connection parameters.
4.
Set the transfer parameters in the right area of the dialog.
5.
Start the transfer in WinCC flexible by selecting "Transfer".
Procedure (WinCC)
If you are loading a project on an HMI device, the "Advanced loading" dialog is automatically
opened. You configure the appropriate interface parameters in this dialog.
For further information, refer to the documentation on WinCC.
Proceed as follows:
1.
If you want to load a project simultaneously on several HMI devices, use multiple
selection to select all the desired HMI devices in the project tree.
2.
Select the "Load to device > Software" command in the shortcut menu of an HMI device.
3.
When the "Advanced loading" dialog appears, configure the "Settings for loading":
–
Select the interface via which the project will be loaded.
–
Configure the corresponding interface parameters.
–
Click on "Load".
You can open the "Advanced loading" dialog at any time via the menu command
"Online > Advanced loading to device…"
The "Load preview" dialog" opens. The entire project is compiled at the same time. The
results is displayed in the "Load preview" dialog.
4.
Check the displayed default settings, and edit these if necessary.
5.
Click on "Load".
Result
The configuring PC checks the connection to the HMI device. The HMI device shuts down
the current project and automatically changes to "Transfer" mode. The project is transferred
to the HMI device. An error message is displayed on the configuring PC if the connection is
not available or disrupted.
The project is available on the HMI device following successful transfer. The transferred
project is started automatically.
Содержание LOGO!
Страница 8: ...Preface LOGO 8 Manual 04 2011 A5E03556174 01 ...
Страница 136: ...Programming LOGO 3 9 Memory space and circuit program size LOGO 136 Manual 04 2011 A5E03556174 01 ...
Страница 278: ...LOGO functions 4 4 Special functions list SF LOGO 278 Manual 04 2011 A5E03556174 01 ...
Страница 302: ...Configuring LOGO 7 2 Setting the default values for LOGO LOGO 302 Manual 04 2011 A5E03556174 01 ...
Страница 366: ...Abbreviations LOGO 366 Manual 04 2011 A5E03556174 01 ...
Страница 372: ...Index LOGO 372 Manual 04 2011 A5E03556174 01 ...
Страница 400: ...Safety instructions 2 3 Notes about usage Basic Panels 28 Operating Instructions 04 2012 A5E02421799 03 ...
Страница 534: ...Index Basic Panels 162 Operating Instructions 04 2012 A5E02421799 03 ...