10.2 Testing the pumps
All the pumps are tested in the same manner. Here is a description of the test of the hot water pump. Wiring
test must be Active when testing the pumps.
The test shows if the pumps and their control are correctly connected.
NOTE:
Wiring test is active until it is set to Passive. For the control to work, the cable test in normal operation
must be set to Passive.
NOTE:
The pump must be manually put back into Auto or On mode after the test.
1. From the Main index select
Commissioning
.
2. Now select
Wiring test
.
3. Select
Heating circuit 1
or
Domest. hot water
depending on the pump to be tested.
4. Test the pump by putting the pump in one of the
following modes:
•
on
•
off
•
auto.
Press
OK
.
5. After the test, the pump must be set in the same
position as before the test.
6. Wiring test is to be set to Passive after the test.
10.3 Testing the valves
All the valves are tested in the same manner. Here is a description of the test of the primary circuit valve.
Wiring test must be active when testing the valves.
The test shows if the valves and their control are correctly connected.
NOTE:
Wiring test is active until it is set to Passive. For the control to work, the cable test in normal operation
must be set to Passive.
NOTE:
The valve must be manually put back into the correct mode 0-100% after the test
1. From the Main index select
Commissioning
.
2. Now select
Wiring test
.
3. Select
Heating circuit 1/2/3
or
Domest hot water
depending on the valve to be tested.
4. Test the valve by changing the percentage for the
valve. Range 0-100%
Press
OK
.
5. After the test, the valve must be set in the same
position as before the test.
6. Wiring test is to be set to
Passive
after the test.
Содержание IQHeat
Страница 1: ...Doc 1552 2019 01 30 IQHeat User manual ...
Страница 47: ...IQHeat User manual 45 ...
Страница 48: ...Cetetherm AB Fridhemsvägen 15 372 38 Ronneby Sweden www cetetherm com ...