Installation of Motor Starters
ECOFAST Motor Starters
3-4
GWA 4NEB 950 5221-12 DS 01
3.2.2
Installation
Warning
Hazardous voltages! These may cause electric shock and burns.
Disconnect the system and device from the supply before starting work.
Take note of the information in the operating instructions.
Work through the following steps to install the motor starter:
Table 3-4: Installation: motor plugged in
Step
Description
1
Screw the mounting plate to the motor (motor connector).
2
Place the motor starter on the mounting plate. Push the motor starter onto the
motor connector.
Secure the connection with the locking device.
3
Connect the AS-i cables in accordance with the diagram below:
Attention
If the motor starter is the last station on the AS-Interface line, you must
terminate the ends of the AS-i cables with cable end covers
(Order No.: 3RK1901-1MN00) in order to obtain degree of protection IP65. To
allow this, leave the cable ends projecting by about 10 cm beyond the AS-i
interface.
4
Plug in the power tee clamping connector at the power terminal on the motor
starter. Secure the connection with the locking device.
5
Connect the power cables to the power tee clamping connector.
1
2
3
5
4
AS-i
AUX PWR
3RK1901-1MN00
AS-i
AUX P
WR
Содержание Ecofast 3RK1 323-2AS54-1AA0
Страница 1: ...Motor Starter Manual 03 2007 ecofast Totally Integrated Automation ...
Страница 2: ......
Страница 12: ...ECOFAST Motor Starters viii GWA 4NEB 950 5221 12 DS 01 ...
Страница 40: ...Installation of Motor Starters ECOFAST Motor Starters 3 8 GWA 4NEB 950 5221 12 DS 01 ...
Страница 58: ...Device functions ECOFAST Motor Starters 6 6 GWA 4NEB 950 5221 12 DS 01 ...
Страница 74: ...ECOFAST Motor Starters GWA 4NEB 950 5221 12 DS 01 ...
Страница 75: ......