80/109
Siemens
User Manual
CE1U2357en
Building Technologies
6 The settings in detail
2014-07-30
To identify the current plant diagram, the basic unit generates a check number.
The check number is made up of the lined up part diagram numbers. For the meaning
of the numbers for the relevant operating lines, refer to the following tables:
Solar
Oil / gas boiler
0
No solar
1
Solar with collector sensor
and pump
00 No
boiler
01 1-stage
burner
03
1-stage burner, boiler pump
05
1-stage burner, bypass pump
07
1-stage burner, boiler pump
Bypass pump
DHW storage tank
0
No DHW storage tank
1
electric immersion heater
2
Solar connection
4
charging pump
5
Charging pump, solar
connection
13 Diverting
valve
14
Diverting
valve,
solar
connection
Heating circuit P
Heating circuit 2
Heating circuit 1
0
No heating circuit
2
Heating circuit pump
00
No
heating
circuit
02
Heating
circuit
pump
03
Heating
circuit
pump,
mixing valve
00
No
heating
circuit
01
Circulation via boiler pump
02
Heating
circuit
pump
03
Heating
circuit
pump,
mixing valve
Heat source: Solar with collector sensor and pump,
1-stage burner and boiler pump
Storage tank: Charging pump and solar connection
Heating circuit 1:
Heating circuit pump and mixing valve
2
3
5
8
A
1
4
B2
K4
Y1
B1
Q2
RG1
B9
B31
Q3
B3
B6
Q5
Displays on the operator unit:
Check no heat source 1
101
Check no storage tank
5
Check no. heating circuits
3
The check numbers are always arranged from the right. Preceding 0s are not shown.
Device data
Line no.
Operating line
6220
Software version
The software version indicated here represents the current version of the basic unit.
6.9 Faults
Check no heat source 1
Check no storage tank
Check no. heating circuits
Example