INSTALLATION
_________________________________________________________________________________________________________
3-3
COM-00-21-03 OCTOBER 2021
Version No.: A
3.2
Equipment Installation
3.2.1 Equipment Unpacking and Inspection
Inspect the equipment as soon as possible after delivery. If any part of the equipment has been
damaged in transit, immediately report the extent of the damage to Siemens Customer Service.
3.2.2 Equipment Mounting
Slots are incorporated into the Mercury enclosure to facilitate mounting the unit to a flat surface.
Figure 3-1 Mounting Dimensions
3.2.3 Radio Grounding Guidelines
The Airlink Mercury Radio is equipped with a single grounding point on the rear of the radio. The
ground point must be connected using a 10-32 electrical grounding screw of 3/8” length with a
#10 size ring-lug. This should be connected to a safe earth ground using at least a 12 AWG
protective ground wire.
Figure 3-2 Grounding Point