![Siemens 1PQ8 Скачать руководство пользователя страница 74](http://html.mh-extra.com/html/siemens/1pq8/1pq8_operating-instructions-and-installation-instructions_378977074.webp)
Cooling
● Check that the machine cooling is available for commissioning.
● The water cooling is switched on. The data can be found on the rating plate.
● Cooling water of the configured quality is used.
Electrical connection
● The grounding and equipotential bonding connections have been made correctly.
● The machine is connected so that it rotates in the direction specified.
● Appropriately configured control and speed monitoring functions ensure that the motor
cannot exceed the permissible speeds specified in the technical data. For this purpose,
compare the data on the rating plate or, if necessary, the system-specific documentation.
● The minimum insulation resistance values are within tolerance.
● Minimum air clearances have been maintained.
● Any supplementary motor monitoring devices and equipment have been correctly
connected and are functioning correctly.
● All brakes and backstops are operating correctly.
● At the monitoring devices, the values for "Warning" and "Shutdown" are set.
See also
7.2
Converter operation
The following chapter is relevant only to machines of series 1PQ8 or if the machine was ordered
for operation on the rectifier.
Note
The order number shows whether the machine was ordered for operation with converter: the
9th digit of the order number features the letter "P" or "Q".
Converter operation
● If the design of the motor requires connection to a particular converter type, the rating plate
will contain corresponding additional information.
● The converter is correctly parameterized. The parameterization data is specified on the
rating plate of the machine. Information about the parameters is available in the operating
instructions for the converter.
Start-up
7.2 Converter operation
SIMOTICS TN Series N-compact 1LH8
74
Operating Instructions 06/2017
Содержание 1PQ8
Страница 2: ...06 06 2017 10 16 V15 00 ...
Страница 80: ...Start up 7 8 De energizing SIMOTICS TN Series N compact 1LH8 80 Operating Instructions 06 2017 ...
Страница 92: ...Operation 8 10 faults SIMOTICS TN Series N compact 1LH8 92 Operating Instructions 06 2017 ...
Страница 112: ...Maintenance 9 2 Corrective Maintenance SIMOTICS TN Series N compact 1LH8 112 Operating Instructions 06 2017 ...
Страница 128: ...Disposal 11 4 Disposal of components SIMOTICS TN Series N compact 1LH8 128 Operating Instructions 06 2017 ...
Страница 130: ...Service and Support SIMOTICS TN Series N compact 1LH8 130 Operating Instructions 06 2017 ...
Страница 134: ...Quality documents SIMOTICS TN Series N compact 1LH8 134 Operating Instructions 06 2017 ...
Страница 139: ......