78
RM300 C Models
U24801-J-Z146-2-7600
6
Software
Checking the test screen
Finally, a test screen is displayed. Check that the color and gray scale displayed are
acceptable and that the mouse moves correctly.
Now press any key. You must then decide whether the graphical parameters are
correct.
●
If the test screen is satisfactory and you can operate the mouse without
problems:
Ê
Enter y and skip to the section “Terminating the activation process” on
page 79.
●
If the test screen is not satisfactory:
Ê
Enter
n
.
The configuration windows for the mouse and the graphical monitor reappear.
Ê
Correct the parameters until the test screen is acceptable.
You can also correct the configuration of the graphical parameters after installation
is complete. This procedure is explained in the manual “Reliant UNIX Installation
and Operation – RM200, RM300, RM400“ or in the corresponding manual for SINIX
V5.42.
Server Test Utility
Please try to move the mouse and press some buttons.
Press any key to exit.
Mouse and X11 Server ok? [y/n] >
_
Содержание RM300 C20
Страница 1: ...Edition March 1997 RM300 C Models Operating Manual Reliant UNIX SINIX ...
Страница 4: ......
Страница 5: ...Equipment care Technical data Equipment settings Accessories Reference section and Index ...
Страница 6: ......
Страница 198: ......
Страница 200: ......
Страница 202: ......
Страница 204: ......