1.1.6 Warning Mark Setting
In order to avoid accident for unwanted person gets close to the inverter or makes improper operation,
observe the following requirements while installing, maintaining or repairing.
l
Set warning marks where the switches are to avoid switching them on improperly.
l
Set warning signs or safety warning belt in the operation area, which is to avoid human injury or
device damage.
1.1.7 Electrical Connection
Electrical connection must be performed according to the description in the user manual and the
electrical circuit schematic.
The configuration of PV string, grid level, grid frequency, etc. must meet the technical requirements of
inverter.
Grid-tied generation should be allowed by the local power supply department and the related operation
should be performed by professionals.
All electrical connection must meet the related country and district standard.
1.1.8 Measurement Under Operation
There exists high voltage in the device. If touching device accidently, it may cause electric shock. So,
when perform measurement under operation, it must take protection measure (such as wear insulated
gloves, etc.)
The measuring device must meet the following requirements:
l
The range and operation requirements of measuring device meets the site requirements;
l
The connections for measuring device should be correct and standard to avoid arcing.