First operation
When operating the MSA400 system for the first time, you must perform a reference run and then a calibration/teach-in run.
Perform reference run
1. The sliding sash must be in the CLOSED position in order to begin the reference run. If necessary, slide the sash to this
position manually.
2. Supply power to the .MSA400 system.
3. Press the operating push button. The reference run starts. During the reference run, the sash is unlocked and then locked
again.
4. Wait approx. 4 - 10 seconds until the sash is locked. The LED switches off once the reference run is complete.
1.
2.
3.
4.
4 - 10 Sek.
Note:
A reference run must also be performed after a power failure in order to re-initialise the MSA400 again.