Installation and operating instructions
MSA400 smart
05.2017
19
8.3 Calibration and teach-in run
Risk of injury! Hands, arms, legs and feet can get trapped and/or crushed! There
is no safety cut-off function!
›
During the entire calibration and teach-in run, maintain a safe distance from the moving elements.
Risk due to incorrect measured values!
›
To prevent incorrect measured values, never interrupt or interfere with the calibration and teach-in run of the
MSA400 smart system!
1. Block sliding sash 2 (not applicable for scheme A).
2. The sliding sash must be in the CLOSED position in order to begin the calibration and teach-in run. If necessary, slide the
sash to this position manually.
3. Press the
Prog
button; the LED flashes green.
4. Press and hold the operating push button for approx. 11 seconds until a short acoustic signal sounds 4 times in successi-
on.
5. Release the operating push button.
6. Press and hold the operating push button for approx. 2 seconds until a short acoustic signal sounds once.
7. Release the operating push button. The calibration and teach-in run starts. The LED flashes red.
During the calibration and teach-in run, the sliding sash travels to the OPEN and CLOSED positions twice.
8. The element stops at sliding sash 2. Remove the blockage within approx. 5 seconds (not applicable for scheme A).
9. The LED switches off once the calibration and teach-in run is complete.
1.
3.
4.
11 sec.
BEEP
1x
BEEP
2x
BEEP
3x
BEEP
4x
1
2
F
6.
7.
9.
2 x
BEEP
1x
2 sec.
Once the calibration and teach-in run has been completed successfully, the MSA400 smart system is ready for normal
operation.