3
6146
2
2019
-
SH 360
MC_0113
Planning Considerations and Precautions
EN
• Do not install the thruster in a position where you need to cut a stiff ener/ stringer/ support for the hull integrity without checking with the boat builder
this can be done safely.
• The motor, its components, contacts/ plugs or other joints in the control cables must be mounted so they will remain dry at all times.
• We advise painting the thruster with primer and antifouling.
(NB: Do not paint the anodes, sealings or propeller shafts)
• Do not fi nish the inside of the tunnel with a layer of gelcoat/ topcoat or similar. There is only room for a thin coat of primer and two layers of anti-fouling
between the tunnel and the props.
• keep installation within advised measurements. The entire surface is hard coated seawater resistant aluminium. Do not damage/penetrate the coat.
• The oil tank is placed higher than the pumps to ensure enough gravity feed and pressure for feed ports.
(NB: The height of oil levels in the
hydraulic tank should be higher than the connected hydraulic pumps.)
• Find a suitable location for the hydraulic tank installation for future maintenance accessibility. There must be enough space around the oil tank to
change fi lters, fi ll oil and inspect gauges and indicators.
It is the installers responsibility
When installing Side-Power equipment to follow the outlined regulations/ classifi cation rules (electrical/ mechanical) according to
international or special national regulations. Instructions in this guide cannot be guaranteed to comply with global electric/ mechanic
regulations/ classifi cation rules.
It is the installers responsibility
To follow all health and safety laws in accordance with their local outlined regulations/ classifi cation rules.
Before installation, it is important that the installer reads this guide to ensure necessary acquaintance with this product.
The recommendations made in this manual are guidelines ONLY, and Sleipner Motor AS (Side-Power) strongly recommend that
before installation, advice is obtained from a naval architect familiar with the particular vessel and regulations/ classifi cations.
This manual is intended to support educated/ experienced staff and is therefore not suffi cient in all details for professional
installation.
(NB: These instructions are only general instruction. If you are not skilled to do this work, please contact professional
installers for assistance.)
All electrical work must be done by a licensed professional.
IMPORTANT
Faulty installation of the tunnel, thruster or panel will render all warranty given by Sleipner Motor AS void.
MC_0038
Содержание SH-300
Страница 25: ...25 6146 2 2019 SH 360 MC_0037 Notes EN ...
Страница 26: ...26 6146 2 2019 SH 360 MC_0037 Notes EN ...
Страница 27: ...27 6146 2 2019 SH 360 MC_0037 Notes EN ...