
Operating Instructions
Chapter
12
UE4155
8010178/TF82/2010-03-05
© SICK AG • Industrial Safety Systems • Germany • All rights reserved
81
Subject to change without notice
Annex
Tab. 38: Diagnostics data of the 2nd device on SDL connection 1 (Guest 1)....................74
Tab. 39: Diagnostics data of the 3rd device on SDL connection 1 (Guest 2) ....................74
Tab. 40: Diagnostics data of the 1st device on SDL connection 2 (Host) ..........................75
Tab. 41: Diagnostics data of the 2nd device on SDL connection 2 (Guest 1)....................76
Tab. 42: Diagnostics data of the 3rd device on SDL connection 2 (Guest 2) ....................76
12.7
List of illustrations
Power-supply pin assignment (7/8" connection)...................................................28
Pin assignment of SDL connection M23 × 12........................................................29
Pin assignment of field-signal connections M12 × 5 + FE.....................................30
Pin assignment of the PROFIBUS connection (plug and socket)..........................31
Pin assignment configuration connection M8 × 4..................................................32
Fig. 10: Example of the emergency stop circuit ..................................................................33
Fig. 11: Example of a circuit for electro-sensitive protective equipment on the
Fig. 12: Example of a circuit for an untested Muting-Sensor .............................................34
Fig. 13: Example of a circuit for a control switch with indicator display ............................35
Fig. 14: Connection of a muting lamp..................................................................................35
Fig. 15: Setting the PROFIBUS address on the UE4155.....................................................42
Fig. 16: Dimensional drawing bus node UE4155 (mm)......................................................61
Fig. 17: EC declaration of conformity (page 1)....................................................................77
Fig. 18: EC declaration of conformity (page 2)....................................................................78