Operating Instructions
Chapter
6
CLP 100 Bar Code Reader
Operation
8 008 912/0000/21-08-2002
©
SICK AG · Division Auto Ident · Germany · All rights reserved
19
5.4.6
Wiring the "Result" switching output
The switching output can have various result functions assigned to it. If the corresponding
event occurs during a reading process, the switching output becomes live for the selected
pulse duration.
Figure 5-4
shows the wiring of the "Result" switching output.
Table 5-5
lists
the characteristic data of the switching output.
Recommendation
¾
In order to check the switching functions wire the switching output to a load and measure
the voltage with a high-voltage digital voltmeter. This avoids the display of incorrect
voltage values and switching states.
¾
Wire the switching output as described in
Figure
Hint
The D
EVICE
CONFIGURATION
tab card of the CLP Setup software can be used to modify the
function assignment, the pulse duration and the output instant of the signal.
6
Operation
6.1
Startup steps
•
Startup of the CLP 100 with the default setting set by factory (Quick-Start).
The CLP 100 can be operated without a connection to the PC in this configuration.
•
Connecting the PC (
refer to Section 5.4.4, Page 18
) and installing the CLP Setup software
(
refer to Section 10.2, Page 33
•
Parameterizing of the CLP 100 with the CLP Setup software or with command strings.
6.2
Default setting
Table 6-1
shows an overview of the default setting of our works for the CLP 100. The
parameters in the default setting are selected so that the CLP 100 can be used directly for
many applications in this configuration. With the default setting no PC is required for starting
up.
Fig. 5-4:
Wiring of the "Result" switching output (NPN)
Switching performance
NPN switching against GND
Properties
Not electrically separated
Electrical values
Tab. 5-6: Characteristic data of the "Result" switching output
5V
U
30V
≤ ≤
I
50mA
≤