Step
4:
Attach
Left
Hand
Side
Panel
1. Remove
the
two
5/16
bolts
and
nuts
from
the
two
LH1
holes
in
the
LH
frame
panel.
2. Place
the
Left
Side
Panel
over
the
upward
facing
threaded
rods
on
the
support
tubes,
wiggle
the
RH
tubes
to
align
the
three
corresponding
holes
on
the
side
panel.
3. Check
to
be
sure
the
ends
of
the
RH
tubes
are
flush
against
the
left
and
right
side
panels.
4. Add
the
two
5/16
bolts
through
the
top
rail
frame
into
the
Footend
Bracket,
lightly
tighten
nuts.
5. Replace
the
nuts
and
washer
(washer
to
center
tube
only)
on
the
upward
facing
threaded
rods.
6. Rotate
the
entire
frame
assembly
and
place
it
on
the
floor
with
feet
down.
7. Tighten
nuts
on
RH
and
LH
side
of
outside
of
frame.
Page
9
of
73
Содержание Shuttle Recovery
Страница 2: ...Page 2 of 73 ...
Страница 4: ...Page 4 of 73 ...
Страница 19: ...Step 2 Attach Ropes to Towers Page 19 of 73 ...
Страница 25: ...Page 25 of 73 ...
Страница 27: ...Page 27 of 73 ...
Страница 29: ...Page 29 of 73 ...
Страница 41: ...Page 41 of 73 ...
Страница 48: ...Page 48 of 73 ...