The installation m ust alw ays be secured w ith a secondary safety attachm ent, e.g.
derigging or servicing the fixture staying in the area below the installation
place, on bridges, under high w orking places and other endangered areas is forbidden.
The projector should be installed outside areas w here persons m ay w alk by or be seated.
used, and periodic safety inspection of all installationm aterial and the projector.
Im proper installation can result in bodily injury and or
The projector has to be installed out of the reach of people.
If the projector shall be low ered from the ceiling or high joists,
system s have to be used. The projector m ust never be fixed sw inging freely in the room .
5.3 Inserting/E xchanging gobos
D A N G E R :Install the gobos w ith the device sw itched off only.U nplug from m ains before!
If you w ish to use other form s and patterns as the standard-gobos, or if gobos are to be
exchanged, open the topcover of the head by loosening
the fixation ring w ith an appropriate tool.
R em ove the gobo and insert the new gobo.
the fixation ring together and insert it in the front of the gobo.
C A U T IO N :N ever unscrew the screw s of the rotating goboas the ball bearing w ill