
SHINKO- Tropical R410A High Efficient A5 Duct Technical Manual 50Hz
5
4.
Product features
Indoor Unit
General
These duct type indoor units which capacity range is from 4ton to 5ton, are suitable for
mounting above ceiling. The units are factory assembled, internally wired and tested before
leaving the manufacturer. The indoor units are insulated by polyethylene foam.
Casing
The units are constructed form Heavy Gauge Zinc coated steel sheets. The sheet steel zinc
coated by hot dip process conforming to standard ASTM A653.
Evaporator
Internally finned, copper tubes mechanically bonded to a configured hydrophilic aluminum fin
shall be standard. Coils are leak tested at the factory to ensure the pressure integrity. The
evaporator coil is already leak tested to 3,100kPa (450 psig). Anti-corrosion treatment for coils is
optional.
Drain pan
The condensate drain pan is fabricated of EPS. The inner of the drain pan adopts vacuum
forming technology.
Indoor fan
The indoor units have centrifugal fan. The fan is directly driven by indoor fan motor.
Filter
The filter is already fix in the frame of air return. It is Nylon washable type.
Outdoor unit
General
The outdoor units are top-discharge type. The units with weatherproof heavy gauge base are
factory assembled, internally wired, fully charged refrigerant and 100% run tested to check
cooling operation, fan rotation and control sequence before leaving the factory.
Содержание SOVC-48CN1-RC7C
Страница 13: ...SHINKO Tropical R410A High Efficient A5 Duct Technical Manual 50Hz 12 6 Wiring Diagrams STB 48CWN1 STB 60CWN1 ...
Страница 22: ...SHINKO 4 5 ton High Efficiency A5 Duct Technical Manual 21 3 Service Space ...
Страница 23: ...SHINKO 4 5 ton High Efficiency A5 Duct Technical Manual 22 4 Wiring Diagrams SOVC 48CN1 RC7C SOVC 60CN1 RC5C ...
Страница 47: ...SHINKO 4 5 ton High Efficiency A5 Duct Technical Manual 46 Power supply phase sequence error ...
Страница 48: ...SHINKO 4 5 ton High Efficiency A5 Duct Technical Manual 47 Lack of Phase A B and C of power supply ...
Страница 50: ...SHINKO 4 5 ton High Efficiency A5 Duct Technical Manual 49 Over current protection of compressor ...
Страница 53: ...SHINKO 4 5 ton High Efficiency A5 Duct Technical Manual 52 Eeprom error ...