
SHINKO- 4
/
5 ton High Efficiency A5 Duct Technical Manual
28
reported immediately to the service agent.
When handling the unit, take into account the following:
✓
Fragile, handle the unit with care.
✓
Move the unit as originally package as possible.
✓
When lifting the unit, always use protectors to prevent belt damage and pay attention to the
position of the unit’s center of gravity.
2.
Installation of the Indoor Units
2.1 Installating indoor units
As the following picture, when install the indoor unit, select the enough solid and level site with
enough space for installation and maintenance.
The inspection orifice should be enough larger to repair and maintenance the unit.
Ensure that the minimum drain gradient is over 1/100.
Please refer to the following figure for the distance measurement between the screw bolts.
Please install with screw bolts. Use
Ф10 or bigger screws.
The handling to the ceiling varies from constructions consult the construction personnels for the
specific procedures.
Cut off the roof beam. Strengthen the place cut off, and consolidate the roof beam.
Carry out the pipe and line operation in the ceiling after finishing the installation of the main body.
While choosing where to start the operation, determine the direction of the pipes to be drawn out.
Especially in case there is a ceiling, position the refrigerant pipes, drain pipes, indoor and outdoor
lines to the connection places before hanging up the unit.
Содержание SOVC-48CN1-RC7C
Страница 13: ...SHINKO Tropical R410A High Efficient A5 Duct Technical Manual 50Hz 12 6 Wiring Diagrams STB 48CWN1 STB 60CWN1 ...
Страница 22: ...SHINKO 4 5 ton High Efficiency A5 Duct Technical Manual 21 3 Service Space ...
Страница 23: ...SHINKO 4 5 ton High Efficiency A5 Duct Technical Manual 22 4 Wiring Diagrams SOVC 48CN1 RC7C SOVC 60CN1 RC5C ...
Страница 47: ...SHINKO 4 5 ton High Efficiency A5 Duct Technical Manual 46 Power supply phase sequence error ...
Страница 48: ...SHINKO 4 5 ton High Efficiency A5 Duct Technical Manual 47 Lack of Phase A B and C of power supply ...
Страница 50: ...SHINKO 4 5 ton High Efficiency A5 Duct Technical Manual 49 Over current protection of compressor ...
Страница 53: ...SHINKO 4 5 ton High Efficiency A5 Duct Technical Manual 52 Eeprom error ...