23(41)
3.2 Installation Place
Make enough installation space to facilitate the repair and maintenance.
Check and make sure the installation ground is level, and there is enough
intensity when it is running.
Use spirit level to adjust the cutting chamber to the level position.
Picture 3-2: Installation Place
3.3 Installation of Blade Rest and Bearing
3.3.1 Installation of Blade Rest Shaft
Blade rest shaft is consisted of blade rest and its shaft. Before installation, please
clean up the dust and impurities from the blade rest and its shaft, if there is any left,
it will unable to install the blade rest on shaft or lead to scrap. After cleaning, put
the blade rest on the hydraulic machine, and then put the shaft onto the pivot of
blade rest and keep the shaft vertical. After finish those procedure, daub
lubricating oil on the shaft to facilitate its pushing into.
Picture 3-3: Installation of Blade Rest Shaft
Содержание SG-23E
Страница 1: ...SG 23E 30E Standard Series Central Granulators Date Oct 2018 Version Ver C English...
Страница 2: ......
Страница 6: ...6 41 Picture 6 4 Adjust the V belt 2 37 Picture 6 5 Lubricating Method 37 Picture 6 6 Star Screw 38...
Страница 29: ...29 41 Picture 3 11 Blades Installation Adjusting SG 30E...