27(41)
3) Fix the sustain frame between the base of the feed box and the cutting
chamber, open the adjusting sustain frame to fix the screw.
4) Arrange the flashboard of the feed box properly to the groove and close it,
use star knob to lock the feed box and the cutting chamber.
5) Mount the material stopper and feed port, then lock them up.
Picture 3-9: Installation of the Feed Box, Feed Port and Material Stopper
3.7 Installation of the Blade
Notice!
The blades are very sharp, so use protective gloves at the installation to
avoid being cut.
1) Clean the sustain block of the fixed blade and rotating blade firstly.
2) Put the rotating blade in the groove and press on the blade block, and then
use screw to lock it.
3) Install the front and back press block on the front and back case block,
obligate proper gap for inserting fixed blade.
4) Mount headless screw in the adjusting hole of the front and back fixed
blade in order to move the fixed blade to adjust the gap.
5) Adjust the distance of fixed and rotating blades to about 0.20~0.30mm.
(This distance should not be too small, or blades damage can be caused.)
6) After adjusted the distance, tightly lock the blades.
Содержание SG-23E
Страница 1: ...SG 23E 30E Standard Series Central Granulators Date Oct 2018 Version Ver C English...
Страница 2: ......
Страница 6: ...6 41 Picture 6 4 Adjust the V belt 2 37 Picture 6 5 Lubricating Method 37 Picture 6 6 Star Screw 38...
Страница 29: ...29 41 Picture 3 11 Blades Installation Adjusting SG 30E...