40(41)
6.6 Maintenance Schedule
6.6.1 About the Machine
Model SN Manufacture date
Voltage
Ф
V Frequency Hz Power kW
6.6.2 Check After Installation
Check the gap between fixed blade and rotating blade. (0.2~0.3mm).
Check the rotating balance of the belt wheel.
Electrical Installation
Voltage: V Hz
Specs of the fuse: 1 Phase A 3 Phase A
Check phase sequence of the power supply.
6.6.3 Daily Check
Check emergency stop button.
Check start / stop button.
Check material check plate (strip) is perfect or not.
Check whether emergency stop and safety switch works normally.
Clean screen and feeding hooper.
Check whether start, stop and power switches are normal.
6.6.4 Weekly Check
Check all the electrical cables.
Check if there are loose connections of electrical components.
Check blade condition.
Check whether set screws in fixed and rotate blades are under looseness.
Check if there is abnormal noise, vibration and heat in reduction gear.
Check the cracking window
6.6.5 Monthly Check
Check the overload protection function of the motor.
Check motor reversed running function.
Check the tightness of the blades.
Check whether clamp ring of pulley is fastened.
Check belt tension.
Содержание SG-23E
Страница 1: ...SG 23E 30E Standard Series Central Granulators Date Oct 2018 Version Ver C English...
Страница 2: ......
Страница 6: ...6 41 Picture 6 4 Adjust the V belt 2 37 Picture 6 5 Lubricating Method 37 Picture 6 6 Star Screw 38...
Страница 29: ...29 41 Picture 3 11 Blades Installation Adjusting SG 30E...