35(47)
Note
!
Do not finish installation of blades with help from others to avoid personal
injury.
Lock the blade rest shaft with a thick wood block on the cutting chamber.
1) Open the door of granulator to take out the screen and open feed box.
2) Loosen screws of fixed blade press block and take out the fixed blade.
3) Loosen screws of rotary blade press block and take out the rotary blade.
4) After taking out the blades, clean the blade installation groove.
5) Re-assemble prepared new blades. Check whether the screen meshes are
out of shape. If there is any meshes turn to be oval, replace the screen
immediately.
6) Turn the blade rest shaft and check the clearances between blades until all
the clearances meet the requirement.
Picture 6-1: Disassemble the rotary blades
6.1.4 Conveying
6.1.4.1 Daily Maintenance and Adjustment of V-belt
Granulator is driven by 4 V-belt. The specification of the V-belt is XPA.
1) Inspect V-belt
After 20-30 hours of full-load operation, inspect the tension of V-belt and
running situation. Then, check the abrasion of belts every month.
2) Inspect the tension of V-belt every 6 months.
Loosen the screws which are on right shell and for fixing the electric control
box and then take out the upper cover plate of granulator. Turn the V-belt for
several circles to see whether the belt is damaged and worn.
Caution
!
Do not put the hand between belt and belt pulley. Otherwise, the hand
may be jammed; inspect the tension of belt, and adjust it if necessary.
Содержание SG-23 Series
Страница 1: ...SG 23 30 Sound proof Central Granulator Date Sep 2017 Version Ver C English...
Страница 2: ......