15(33)
3. Installation and Debugging
This series of models only could be applied in working environment with good
ventilation.
Read this chapter carefully before installation of the machine. Install the
machine by following steps.
Power supply should be fixed by qualified technicians!
3.1 Install the Machine on the Dryer
3.1.1 Installation Elements
Picture 3-1: Installation Elements
3.1.2 Installation Steps
1) Put the main body of the machine at a proper place and connect it with power
supply.
2) Install material hopper onto the dryer and connect it with signal wires from the
main body.
3) Use steel wire conveying hose to connect air suction pipe (A) on material
hopper with air suction pipe (D) on main body. Material suction (B) should be
connected with material suction probe (B) in material storage bin.
4) Connect high pressure air pipe (C) with air supply (pressure at 3~6kg/cm
2
).