6.7 Maintenance Schedule
6.7.1 About the Machine
Model SN Manufacture date
Voltage
Ф
V Frequency Hz Power kW
6.7.2 Installation & Inspection
Check if the takeover pipe has been correctly connected.
Check if that pipe is locked up by clips.
Check if mounting base is locked tightly.
Electrical Installation
Voltage: V Hz
Fuse melting current: One-phase: A Three-phase: A
Check phase sequence of power supply.
6.7.3 Daily Checking
Check main power switch.
Check filter mesh.
Check working status of the motor.
6.7.4 Weekly Checking
Check all the electrical cables.
Check if there are loose connections of electrical components.
Check the screw of the feed-in pipe's flange is loosed or not.
Check the air filter.
6.7.5 Monthly Checking
Check the spring lock on the hopper cover is loosed or not.
Check the reversal stop piece is deformed or not.
Check the performance of magnetic proximity switch/photoelectrical sensor.